1
Mark off all measurements on floor using blue chalk line. (Measurements
are included on project drawings.)
2
Project chalk lines from the floor to the roof members using plumb bob or
laser plumb pointer.
CAUTION: All measurements indicate center of clamp. Don’t forget
to add or subtract distance to clamp edges when placing clamps.
3
Attach clamp assemblies to roof structure (use numbers on project draw-
ings to cross reference figures below). See Fig. G-1 and Fig. G-2 for tips
on beam and tube mounts.
Please Note:
Make sure all bolt and screw heads are toward the floor
(threads pointing up).
4
Place superstructure tubing into clamp assemblies, insert cap screws,
and start nuts.
Please Note: All superstructure must be plumb and level before
attaching T-Frame.
5
Tighten with impact tool. All Progressive Sports Construction Group
Gymnasium Equipment is supplied with Grade 5 hardware. Clamps are
designed to be installed with the nuts and bolts “tight.” Progressive
Sports Construction Group would consider tight to be torques between
40 ft-lbs and 60 ft-lbs.
Superstructure (Truss) Attachment
Beam
or joist
4" tubing
1
/
2
"-13 x 2
1
/
2
"
Cap Screw,
Flange Lock Nut (4)
4" x 2"
H.C. (2)
0032
A0473 (2)
A0473 (2)
A0259 (2)
A0473
Split-A Clamp Assembly
Beam
or Joist
4" Tubing
A0251
A0486
1
/
2
"-13 x 2
1
/
2
"
Cap Screw,
Flange Lock Nut (4)
A0259 (2)
0032
4" x 2"
H.C. (2)
A0486
Reversed Split-A Clamp
A0250
Beam Clamp Angle
Beam
or Joist
4" Tubing
A0251
A0250
A0259 (2)
0032
4" x 2"
H.C.
1
/
2
"-13 x 2
1
/
2
"
Cap Screw,
Flange Lock Nut (2)
0315 or 0337
Split-A Clamp Angle
5"
1"
1"
1
3
/
4
"
0315
0337
1
1
/
4
"
2
1
/
2
"
1
7
/
8
"
A0730, A0731, A0732
Adjustable Split-A Clamp
A0730 X = 3
1
/
4
" -5
3
/
4
" (2
1
/
2
")
A0731 X = 4
3
/
4
" -6
3
/
4
"(2")
A0732 X = 5
3
/
4
" -7
3
/
4
"(2")
Beam
or Joist
0315 or
0337 (2)
4" Tubing
1
/
2
"-13 x 2
1
/
2
"
Cap Screw,
Flange Lock Nut (4)
A0259 (2)
0032
4" x 2"
H.C. (2)
A0730 (2)
-or-
A0731 (2)
-or-
A0732 (2)
X
(Std.
1
/
4
" Flange)
Please Note: Before attachment, hold hanger in place and
mark hole locations on Z-Purlin. Drill
9
/
16
" holes.
1
/
2
"-13 x 2
1
/
2
" Carriage Bolt,
1
/
2
" FT Washer,
1
/
2
" Lock Washer,
1
/
2
" Flange Lock Nut (4)
4" Tubing
0032
4" x 2"
H.C.
1
/
2
"-13 x 2
1
/
2
"
Cap Screw,
Flange Lock Nut (2)
A0325
Wall Mounted Tube Hanger
A0325
Wood Wall Pad
Z-Purlin
0322
1
/
2
"-13 x 1
3
/
4
"
Cap Screw,
Flange Lock Nut (2)
A0100
4" Tubing
0032
A0100 or A0150
Z-Purlin Hanger
1
/
2
"-13 x 2
1
/
2
"
Cap Screw,
Flange Lock Nut (2)
1
1
/
2
"
0322
Backing Plate
1
/
4
"
3"
3
/
4
"
2
1
/
4
"
4
1
/
2
"
3
3
/
4
"
3
/
4
"
Split "A" Clamp
Caution: Progressive Sports Construction Group is not
responsible for roof strength. Do not install truss if roof is not
strong enough to bear stress loads required for backstop.
4" to 14"
Structure
1-1/8"
A0259
1/2"-13
Threaded Rod
C018.088
1/2"-13 Flange
Lock Nut
4" O.D. 11 Gage Tube
Powder coated
C002.695
1/4" Thick Steel
Bracket-Powder coated
C019.069
1/2"-13 x 4" Dia. U-Bolt
Zinc Plated
7-1/16"
5-3/4"
1-3/4"
Slot
3/8"
2-3/4"
Split "A" Clamp
1/2" Flat Washer
1/2" Flat Washer
4" to 14"
Structure
1-1/8"
A0259
1/2"-13
Threaded Rod
C018.088
1/2"-13 Flange
Lock Nut
4" O.D. 11 Gage Tube
Powder coated
C002.695
1/4" Thick Steel
Bracket-Powder coated
C019.069
1/2"-13 x 4" Dia. U-Bolt
Zinc Plated
7-1/16"
5-3/4"
1-3/4"
Slot
3/8"
2-3/4"
Split "A" Clamp
1/2" Flat Washer
1/2" Flat Washer
Basketball Backstops by Progressive Sports Construction Group—Ceiling Suspended
Page 15 of 37
(877) 413-0957
(877) 413-0957