4
days after the delivery date. If the damages are found after this time, the manufacturer will not be
responsible.
INSTALLATION OVERVIEW
This manual will walk you through the installation of the scoreboard. While care has been taken to
consider the many scenarios for installation, some general information applies to all. Use this guide
as closely as possible to ensure proper installation, as follows:
1. Review the product specifications below to determine your specific installation hardware.
2. Determine where to install the scoreboard and install the mounting poles/beams.
3. Arrange scoreboard panels for the assembly process.
4. Install sponsor panels if applicable.
5. Install the control cable for cable-controlled systems. No additional installation is necessary
for Wireless Remote Control systems.
6. Install electrical system.
7. Install any other options; such as protective nets or horns, according to the installation
instructions included with each option package.
8. Test the installed system.
PRODUCT SPECIFICATIONS
Overall Dimensions:
7’10” tall x13-2” long x 8” deep, shipped in three (3) sections
Weight:
Hanging weight approx. 210 lbs
Shipping weight approx. 350 lbs
Mounting Requirements:
(2) 8” steel I-beams (W8 X 31), or (2) 8” OD galvanized steel poles (schedule 40)
Power Requirements:
Scoreboard:
•