11
a) Lay bar/upright construction on the ground with guide rail showing
upwards.
b)
Stick from the bottom (upright’s end) 2 nuts 20 mm, M 8 each in the guide
rail of the upright and push them to the top.
Mount upper hinge with 2 fastening boreholes.
Please consider that the inclined side of the hinge points to the goal
inside. Push nuts 20 mm, M 8 below the boreholes of the hinge and
tighten it with safety hexagon socket screws DIN 7991, M 8 x 16mm.
c) To fix the lower hi
nge stick from the bottom (upright’s end) 1 nut 20 mm,
M 8 each in the guide rail of the upright. Mount lower hinge with 1
fastening borehole.
Please consider that the inclined side of the hinge points to the goal
inside. Push nut 20 mm, M 8 below the borehole of the hinge and fix it at
the upright with safety hexagon socket screw DIN 7991, M 8 x 16mm.