5. Inspection and maintenance:

a) Visual inspections should routinely be realized before each use.

b) Functional inspections should take place at least every six months or according to

manufacturer’s instructions/national regulations/standard specifications.

c) A general inspection should be realized at least once a year or according to

manufacturer’s instructions/national regulations/standard specifications. The
results should be documented correspondingly. The following table shows an
example of an inspection sheet.

The general inspection has to be realized according to E.3 (table E.2) 
 EN 16579.  

__________________________________________________________________________

The copyrights of illustrations and texts are held by the manufacturer.

Inspection sheet for goals 

Summary of Contents for 2619516

Page 1: ...en Stück Beschreibung 1 vollverschweißtes Tor 1 Netz mit Befestigungsschnur 1 Zubehörbeutel 60 x Netzhalter 2 x Kunststoffstopfen Ø 28mm 1 x Sechskant Winkelschraubendreher SW5 1 x Montageanleitung Inhalt Zubehörbeutel 2 Montage des Netzes Stellen Sie zunächst sicher dass die Profilnut am Tor an allen Stellen von Schmutz Verpackungsmaterialien oder sonstigen Fremdkörpern befreit ist sodass die Net...

Page 2: ... Die Verwendung des Tores ohne entsprechende Verankerung erfolgt auf eigene Gefahr Sollten Sie kein Verankerungssystem verwenden so sind beide Bohrungen aus Sicherheitsgründen mit den mitgelieferten Kunststoffkappen zu verschließen Bitte benutzen Sie dafür gegebenenfalls einen Gummihammer 4 Wartung Pflege Sicherheitshinweise Lagerung Dieses Tor ist ausschließlich für Fußball konstruiert und für ke...

Page 3: ...mal jährlich oder je nach Herstellerangaben oder gemäß nach nationalen Verordnungen Normen öfter erfolgen Die Hauptprüfung sollte durch ein Prüfprotokoll entsprechend dokumentiert werden Die nachfolgende Tabelle zeigt das Beispiel eines Prüfprotokolls Prüfprotokoll für Tore Die Ausführung der Hauptprüfung hat nach E 3 Tabelle E 2 nach EN 16579 zu erfolgen __________________________________________...

Page 4: ...Completely welded goal 1 Net with fixing cord 1 Accessories 60 x net holder 2 x plastic stopper Ø 28mm 1 x hexagon screwdriver SW5 1 x assembly instruction Accessories 2 Assembly of the net Make sure that the groove of the goal is clean and all packing material or other material is removed so that the assembly is possible without any problems Now fix and adjust the net rope in the groove Then stic...

Page 5: ...is not part of the delivery The use of the goal without corresponding anchoring system is at your own risk If you do not use any anchoring system close both boreholes with the supplied caps for safety reasons Use a mallet if necessary 4 Maintenance safety and stoage instructions This goal is constructed only for soccer matches and not for other purposes Check all screwed fastenings before use and ...

Page 6: ...ld be realized at least once a year or according to manufacturer s instructions national regulations standard specifications The results should be documented correspondingly The following table shows an example of an inspection sheet The general inspection has to be realized according to E 3 table E 2 EN 16579 __________________________________________________________________________ The copyright...

Reviews: