background image

SPT-N11U and SPT-N12U Chassis Installation Instructions

Certifications and Standards

SPT-N11U and SPT-N12U Installation Instructions

|

5

P/N 71-008728  Rev A, August 2019

CE

The CE symbol on the product label (on the back of the box) indicates this network 
appliance is compliant with the EMC Directive and Low Voltage Directive of the 
European Union. This product meets the following technical standards:

EN 55022 — “Limits and Methods of Measurement of Radio Interference 
Characteristics of Information Technology Equipment.”

EN 55024 — “Limits and methods of measurement of immunity characteristics for 
information technology equipment.”

EN 60950 — “Safety of Information Technology Equipment.”

TUV

This product carries the cTUVus mark.

Key Points of cTUVus Certification: 

The cTUVus mark is accredited by OSHA (NRTL) for the U.S. and SCC for Canada. 

The cTUVus mark is recognized as equivalent to the UL and CSA marks by city, 
county and state/provincial regulators throughout the U.S. and Canada. 

Safety testing conducted to applicable U.S. and Canadian standards and in most cases 
can be combined with testing for other countries.

Summary of Contents for SPT-N11U

Page 1: ...document is intended to guide you to a safe and successful installation of the Spirent SPT N11U or SPT N12U mainframe chassis In this document Certifications and Standards 4 Introduction 7 Site Selec...

Page 2: ...cordance with the Software License Agreement the Software which it supplies will operate in material conformity with the specifications supplied by Spirent for such Software for a period of ninety 90...

Page 3: ...7 dB A weighted sound power level LWA as measured per ISO 3741 Sound Power Noise Measurement and appropriate ear protection should be worn when working in proximity to the chassis Please contact your...

Page 4: ...se Set aside the accessories and power supplies These will be needed later Carefully lift the chassis out of the box using the side and front handles and securely place it on a level and stable surfac...

Page 5: ...nterference Characteristics of Information Technology Equipment EN 55024 Limits and methods of measurement of immunity characteristics for information technology equipment EN 60950 Safety of Informati...

Page 6: ...ins material that presents an environmental concern Spirent encourages users of Spirent provided electrical and electronic equipment to not dispose of the labeled products in waste collection units wh...

Page 7: ...nd both ventilation locations must remain unobstructed for proper operation Inadequate cooling or airflow can result in an over temperature situation that will cause an automatic system shut down The...

Page 8: ...45 cm x 48 9 cm x 84 6 cm 30 76 2 cm depth measured from front mounting flange Installation and shipping weight 125 lb 58 6 kg 3 system and 2 slot PSUs and fans installed no test modules installed App...

Page 9: ...SPT N11U Built in LCD display SPT N12U Front panel LEDs Temperature fan admin link system and system power status Test module slot power status Rear panel LEDs Admin Ethernet link speed and activity C...

Page 10: ...h chassis for four post rack mounting The chassis is shipped standard with a front mounting flange for four post racks and a mid mount flange for two post racks Due to the weight of the system the pow...

Page 11: ...ng the front rack ears There is a risk of equipment damage and personal injury due to the weight of the system 1 Attach the center mount brackets with the supplied screws if they are not already secur...

Page 12: ...in the intended installation location install four 4 rack mount screws through each rack ear and into the rack totaling eight 8 rack mount screws Figure 3 Figure 3 Securing the Center Mount Brackets...

Page 13: ...with a screwdriver if they are secured to the chassis Figure 4 Figure 4 Remove the Center Mount Brackets 2 Install the ACC 2021A tray or a shelf with a depth of at least 30 and with a static loading...

Page 14: ...SPT N12U Chassis Installation Instructions Rack Mounting the SPT N11U SPT N12U 14 SPT N11U and SPT N12U Installation Instructions P N 71 008728 Rev A August 2019 Figure 6 Using an Equipment Lift for...

Page 15: ...connected to a 15A circuit with no other connected equipment and each with its own breaker Installation of this chassis must comply with local and national electrical codes If necessary consult with...

Page 16: ...fans moving to the left the next socket powers module slots 1 4 then 5 8 etc with the leftmost socket powering slots 9 12 For either chassis configuration if all the slots for a particular power socke...

Page 17: ...chassis Using the ACC 2018 Hypermetrics Dual slot Card Carrier Describes the procedure for installing and removing test modules that require card carriers for use in the SPT N11U SPT N12U and SPT N4U...

Page 18: ...Pacific Time Europe Middle East Africa E mail support spirent com Web https support spirent com Phone 33 1 6137 2270 France Phone 44 1803 546333 UK Hours Monday through Thursday 09 00 to 18 00 Friday...

Reviews: