Spirax Sarco Flowin 2 Essential Installation Manual Download Page 2

IM-P330-74 

 MI Issue 1

2

Please note: This document must be read in conjunction with IM-P330-73

Caution

 – The Flowin end of all shielded cables must be grounded to the earth points provided, 

as  described  in  Section  3  of  the  Information  and  Maintenance  Instructions  (IM-P330-73), 
otherwise the EMC performance of the Flowin 2 will be impaired, possibly resulting in flowmeter 
damage or loss of accuracy.

The Flowin 2 must be earthed to the installation pipework, using the braided cables, shake-
proof washers, and the hexagon screws supplied.

Recommended  specification  of  loop  power  supply  and  pulse  output  cables

The loop power supply and pulse output cables must be: 7-strand, screened, twisted pair 
with a cross sectional area of 0.5 mm

2

. The screen must be earthed at the Flowin end of the 

cable only. The maximum cable length must not be greater than 300 m, but in practice is 
governed by the number of loop devices, cable capacitance and total network resistance.

EIA 232 (RS232)

Communication port

(RJ11 socket)

Remote NPN input

(maximum 28 V)

Fig. 2

Remote PNP input

(maximum 28 V)

OR

Loop

powered

4 – 20 mA

display unit

or chart

recorder

9 - 28 Vdc

+

-

R

R

230 V

50 Hz

+

-

1
2
3
4
5

Power

0 Volts

Fuse

1 A

Power

0 Volts

 10 K 

OR

M750 display 
unit

 with 

4 - 20 mA active 
input (supplying 
current loop)

N

L

Pulse

Loop

+ -

+

-

Reviews: