B850-W and B850-P Boiler House Energy Monitor
10.22 BEM configuration parameters
The following table in conjunction with Sections 10.23 to 10.37 are the recommended
order of stages for setting up the BEM. The table lists out the required values that
will need to be entered into each stage. The table can be used as a check list and
ticked off at each stages completion. Save the configuration at each stage to minimise
the risk of data loss. This Quick Start instruction must be used with the B850 Boiler
House Energy Monitor Installation and Maintenance Instruction IM-P408-03.
Tick when
complete
10.23 Steam output (see Section 10.23)
Type
V
Size
W
Max F
X
Steam dryness
Y
Ref pres
Z
Ref temp
10.24 Feedwater (see Section 10.24)
Value
Units
Ref pres
Ref temp
10.25 Condensate return (see Section 10.25)
Value
Units
Nom pres
Ref pres
Ref temp
10.26 Inputs, continued on page 32