Data subject to change without notice
– 23.09.2022 (B)
SPINNER GmbH
│ Erzgiessereistr. 33 │ 80335 München │ Germany │ www.spinner-group.com │ [email protected]
2 Installation
Step 1: Drill a hole with
≥ 29 mm diameter and three holes with 6 mm diameter in the ceiling using
the provided drilling jig.
Step 2: Fix the Interference Absorber to the ceiling with three plastic dowels and M4*25 screws.
Step 3: Secure the antenna to the Interference Absorber with two M4*25 screws.
Freigegeben
Released
SPIClass
RESTRICTED
SPINNER GmbH
2021
, alle Rechte vorbehalten.
Schutzvermerk ISO 16016 beachten.
SPINNER GmbH
2021
, all rights reserved.
Refer to protection notice ISO 16016.