background image

 

 

Data subject to change without notice 

– 23.09.2022 (B) 

SPINNER GmbH 

│ Erzgiessereistr. 33 │ 80335 München │ Germany │ www.spinner-group.com │ [email protected] 

 

 

 

2 Installation 

  

Step 1:  Drill a hole with 

≥ 29 mm diameter and three holes with 6 mm diameter in the ceiling using 

the provided drilling jig.

 

 

 

 

  

 

 

 
 
 
 
 
 
 
 
 

Step 2:  Fix the Interference Absorber to the ceiling with three plastic dowels and M4*25 screws. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Step 3:  Secure the antenna to the Interference Absorber with two M4*25 screws. 

 
 
 
 
 
 
 
 
 
 

 

Freigegeben

Released

SPIClass

RESTRICTED

SPINNER GmbH

2021

, alle Rechte vorbehalten.

Schutzvermerk ISO 16016 beachten.

SPINNER GmbH

2021

, all rights reserved.

Refer to protection notice ISO 16016.

Reviews: