
2
cONTROl PANEl lIGHTS
14 ConTrol panel liGHTS
Warnings
Causes
Solutions
Green light (23)
The machine is on.
Fixed green light (19)
The machine has reached the right
temperature and is now ready:
- for coffee brewing;
- for hot water dispensing.
Flashing green light (19)
The machine is warming up to
brew coffee and dispense hot
water.
Fixed green light (21)
The machine has reached the
right temperature to eject steam.
Flashing green light (21)
The machine is warming up to
eject steam.
Green light (19) and
green light (21)
are flashing simultaneously
Machine’s overtemperature:
coffee may not be brewed.
discharge water into the drip tray
by turning the steam knob (14)
until the green temperature ready
light (19) is permanently on and
green light (21) turns off.
Fixed red light (22)
The water in the tank is
insufficient.
Fill the tank with fresh drinking
water, prime the circuit and start
the procedure again.
The coffee bean hopper is empty. Fill the hopper with coffee beans
and start the procedure again.
Flashing red light (22)
The Brew Group, the grounds
drawer, the drip tray and the front
door are in a wrong position for
the machine’s operation.
Make sure that all components
have been correctly inserted and
closed. The fixed red light will
now turn off.
Downloaded from
www.Manualslib.com
manuals search engine
Summary of Contents for 10001830
Page 4: ... Downloaded from www Manualslib com manuals search engine ...
Page 5: ... Downloaded from www Manualslib com manuals search engine ...
Page 94: ...94 Downloaded from www Manualslib com manuals search engine ...
Page 95: ...95 Downloaded from www Manualslib com manuals search engine ...
Page 96: ...Cod 15000567 Rev 02 del 15 10 06 Downloaded from www Manualslib com manuals search engine ...