17
10. Install the pump head (12) (sometimes called pump casing):
A.
Prepare the pump head clamp (13).
• Apply food grade anti-seize to the threads on the hand nut.
• Adjust the hand nut open so the threaded rod can swing through the receiving side of the
clamp.
B.
Install the pump head gasket (11).
C.
Present the pump head (12) to the backplate/adapter (1) using a laser or bubble level on the
discharge port to ensure orientation is correct.
FIG. 14 - PUMP HEAD, CLAMP, GASKET
FIG. 15 - PUMP HEAD WITH GASKET INSTALLED
\\ASSEMBLY INSTRUCTIONS - SP41
Summary of Contents for SP41
Page 1: ...PUMPS SP41 SP51 SP61 SP81 INSTALLATION OPERATION MAINTENANCE...
Page 32: ...32 PUMP CURVES SP41 SP41 Pump Curves...
Page 33: ...33 PUMP CURVES SP51 SP51 Pump Curves...
Page 34: ...34 PUMP CURVES SP61 SP61 Pump Curves...
Page 35: ...35 PUMP CURVES SP81 SP81 Pump Curves...
Page 36: ...36 PUMP CURVES SP81...
Page 40: ...PUMP IOM REV 8 21...