6.
Connect exhaust system.
• Dryer must be exhausted to the outdoors
•
Use 4 in (102 mm) rigid duct
•
Maximum straight duct length = 65 ft (19.8 m). Each elbow
deduct 10 ft (3 m)
•
Sufficient make-up air must be supplied. The free area of any
opening for outside air must be at least 40 in
2
(25806 mm
2
)
per unit
7.
Position and level the unit.
•
Recommended rear clearance minimum is 2 in (51 mm) for
utility connections and 6 in (152 mm) when venting through
rear of unit
•
Tighten locknut after final adjustment
•
Place four (4) rubber feet on leveling legs
• Unit must not rock
Installation (continued)
8.
Wipe out inside of washtub and dryer drum.
9.
Connect washer and dryer to electrical power – on individual
branch circuit. Refer to serial plate for electrical ratings.
10.
Run washer through one complete cycle to make sure it is
operating properly and properly leveled.
11.
Check for leaks.
12.
Start dryer and check that dryer is heating.
7.
(dryer)
9.
8.
8.
10.
12.
6.
(washer)