4mm hex
wrench
Tools
Required
3. Connect lectern and equipment rack
0118408R5 Page 5 of 16
Figure 3B
(2) 1/4-20 x 15mm JC bolts
(4) 1/4-20 x 40mm
JC bolts
1. Determine which side of the lectern the equipment rack is to be installed (left or right side). (Right-side installation shown.)
2. Attach the unit-to-unit brackets to the equipment rack side panel mounting holes with (4) 1/4-20 x 15mm JC bolts.
Figure 3A
.
Figure 3A
Unit-to-Unit bracket
(2) 1/4-20 x
15mm JC bolts
Unit-to-Unit bracket
Lectern
Equipment Rack with
installed unit-to-unit
brackets
3. Bring the equipment rack to the lectern and align the unit-to-unit
brackets with the mounting holes in the lectern leg.
4. Install (4) 1/4-20 x 40mm JC bolts through the top of the
lectern leg and tighten securely.
Figure 3B
.
Equipment Rack
Lectern leg