background image

Sling 

bracket

0192113 Page 2 of 2

 

925 FIRST AVENUE, CHIPPEWA FALLS, WI 54729  /  800-235-1262  /  715-723-6750  /  WWW.SPECTRUMFURNITURE.COM

925 FIRST AVENUE, CHIPPEWA FALLS, WI 54729  /  800-235-1262  /  715-723-6750  /  WWW.SPECTRUMFURNITURE.COM

© 2020 Spectrum Industries Inc., All rights reserved.

2.  Attach straps

2.  Attach straps

1.  Thread the (3) straps through the slots in the sling bracket 

and base as shown in 

Figure 2

 with the tails hanging down.

2.  Thread each strap through the buckles as shown.

Figure 2

CPU tower

Strap / buckle 

assembly

1.  Slide the base to the widest position and carefully place the CPU 

tower into the sling.  

Figure 3.

2.  Slide the base tight against the tower and tighten the two wing nuts.

3.  Position all (3) buckles at the same height.

4.  Tighten the straps by pulling on tails until the CPU tower and base 

are level.

3.  Install CPU tower

3.  Install CPU tower

Figure 3

Buckle

Tails

CPU Sling

Sling 

base

1/4-20 

Wing nut

(2 required)

Sling 

base

Reviews: