Floor Anchoring (Toe Kick models only)
1.
If your CPL is equipped with a toe-kick, and you wish to attach it to the floor, the toe-kick will need to be detached
from the unit. To detach, remove the (4) 1/4-20 x 40mm JC bolts (one on each corner) from inside the cart.
2. Carefully lift the lectern off the toe-kick. This will require several people.
Figure 4
.
3.
Locate the toe-kick into its final position on the floor and mark the (4) mounting hole locations on the floor (The
toe-kick mounting holes are approximately 1/2” dia.)
4.
Drill holes into the floor and anchor the toe-kick with appropriate fasteners.
5. Carefully lift the lectern back onto the toe-kick and align the (4) mounting holes.
6. Re-attach the lectern to the toe-kick with the previously removed JC bolts.
CPL
toe kick
058719R8 Page 4 of 10
Figure 4
1/4-20 x 15mm JC bolt
(4 req’d)
Note:
4 fasteners are required
to anchor toe kick to floor.
(fasteners not included).