Operation
SPECTRO GENESIS FES 27 — 17.07.2019
— 23
5
Operation
5.1
Overview of controls
Fig. 10
No. Control element
Function
1
Plasma Off
Switches the plasma off
2
Main switch
Power supply
5.2
Preparing the instrument for use
Before switching on the instrument, proceed as follows:
1.
Instructions on how to install the Plasma torch and the sample introduction
system, see page 33.
2.
Open the Argon supply valve.
Set the Argon pressure to 7.0 bar.
The plasma cannot be started at a pressure of < 6.0 bar. A
corresponding error message will be displayed.
3.
Ensure that the extraction system is activated and that the specified exhaust
capacity is reached.
4.
Ensure that all flaps and doors are closed.
The instrument is ready for use.
Summary of Contents for FES 27
Page 2: ......