14
MPC-5000 Wiring
Mount the control box on a vertical surface with the wire grommets down, central to the
other system components. Make sure the cables will reach all of the modules to avoid
splices.
Filter Sensor harness
6’ (2M)
Control cable 50’ (15.2M)
Protect connector while routing through
the vessel. Control Box
Clark Pump harness, RotoFlow meter,
salinity probe, and diversion valve feed
15’ (4.5M). See next page.
MPC-5000 display. Mount in
dry central location. Only con-
nect the MPC “plug in” cable.
Main power feed. Install cover
after terminating wires.
Use a 15 amp breaker or fuse
Pump feed 4’(1.2M) may be
extended as required. Count
additional length in wire siz-
ing. Wire fan in parallel.
Fresh water flush
feed 15’ (4.5M)
Splice to flush valve.
Heat connectors to
shrink.
Wire Size Guide for Ventura 150 12V
Protect with 15 Amp Fuse or Circuit Breaker
# 10 Gauge (6mm) to 15 feet (4.5M)
# 8 Gauge (10 mm) to 25 feet (7.5M)
#6 Gauge (16mm) to 35 feet (10.6M)
Wire Size Guide for the Ventura 150 24V
Protect with 7 Amp Fuse or Circuit Breaker
#12 Gauge(4mm) to 10 feet (3M)
#10 Gauge (6mm) to 25 feet (7.6M)
#8 Gauge (10mm) to 35 feet (10.6M)
Total length for a pair of wires!