After installation
it i
s i
mportant to confirm that the pressure regulator on the inlet to th
e char-
coal filter i
s set properly.
Lead th
e outlet hose from the ch
arcoal filter to a buck
et of a known volume.
Open the gray flush valve to al
low water to pass through the fi
lter.
U
sin
g a stopwatch, time how
lon
g
it takes to fill the bucket.
The regu
lator should be set so that it allow
s 1.5
gpm (5.7
lp
m) through.
Adju
st the regulator by
tightenin
g or
loosen
in
g the flathead screw on the r
egulator.
Fol
low the instructions
in the system
U
ser Manual for proper operation once th
e flow rate has
been set properly.
Fresh Water Flush
Va
lve
Pressure Regulator