background image

After installation 

it i

s i

mportant to confirm that the pressure regulator on the inlet to th

e char-

coal filter i

s set properly.

 

 

Lead th

e outlet hose from the ch

arcoal filter to a buck

et of a known volume.

 

 

Open the gray flush valve to al

low water to pass through the fi

lter.

 

 

U

sin

g a stopwatch, time how 

lon

it takes to fill the bucket.  

 

The regu

lator should be set so that it allow

s 1.5 

gpm (5.7 

lp

m) through.  

Adju

st the regulator by 

tightenin

g or 

loosen

in

g the flathead screw on the r

egulator.

 

 

Fol

low  the instructions 

in the system 

U

ser Manual for proper operation once th

e flow rate has 

been set properly.

 

Fresh Water Flush 

Va

lve  

Pressure Regulator

 

Reviews: