5
Unpack the system and inspect it to make sure that it has not been damaged in shipment.
Refer to the shipping list for your system to make sure you have received all of the
components listed. Do not discard any packaging until you have found and identified all of
the parts. The small installation parts are listed on the cellophane bags’ pick list.
We will not be held responsible for shortages that are not reported within thirty days of the
ship date. Shipping damage must be reported within 30 days of receiving goods.
Next, study the system layout diagram, component photos and descriptions before beginning
your installation. This will assist you in understanding the function of each component.
Layout the system. Before starting the installation identify the location where each module
and component will be placed. Ensure that there is proper clearance around the components
for removal of filters and system service. Also check to make sure you have adequate tubing
and hose before starting so additional parts may be ordered. Check to see that the MPC cable
is long enough to reach from the display location to the feed pump module.
Farallon shipping list:
Spectra-Pearson Pump Module with remote mountable Control Box
Boost Pump
Pre-filter Module
Fresh Water Flush Module
Inlet and Brine Discharge Service Modules
Install Kit
Service Kit
25’ 5/8” Braided Nylon Brine Discharge Hose
10’ 3/4” Spiral Wound Reinforced Suction Hose
25’ 3/4” Braided Nylon Intake Hose
25’ 1/2” Parker Product Tubing
10’ 3/8” Low Pressure Tubing
Getting Started
Summary of Contents for Farallon 1800
Page 2: ...2...
Page 15: ...15 John Guest Super Speedfit Fittings...
Page 43: ...43...
Page 44: ...44 Farallon 1800 Settings Farallon 2800 Settings...
Page 45: ...45 Float Switch Wiring...
Page 53: ...53...