Specialized RETUL MATCH GLOBAL Manual Download Page 2

For further assistance please call (800) 722-4423

ASSEMBLY INSTRUCTIONS

P/N : 09118-1010

2/2

HARDWARE:

POWER SWITCH

COMPUTER SWITCH

PRIOR TO TURNING PC ON, PLEASE MAKE SURE THAT USB 
PLUG IS INSERTED AND KEPT STRAIGHT. PLEASE MAKE SURE 
ALL OTHER PLUGS ARE INSERTED CORRECTLY.

HEX HEAD BOLT M8X20

(6) HEX HEAD 
BOLTS M8X20

PROTECTIVE LAYER

(4) WING BOLTS

QTY:  6

TRIPOD HEAD
QTY:  1

WING NUT M6X12
QTY:  4

TRIPOD HEAD BOLT 3/8” -16X 5/8”
QTY:  1

POWER CORD

(1) 3/8”-16X5/8” BOLTS

RETUL MATCH GLOBAL

STEP 1:
LAY  PROTECTIVE LAYER ON FLOOR. USING 2 PEOPLE
LIFT TOWER FROM BOX, REMOVE PLASTIC COVER. LAY
TOWER ON PROTECTIVE LAYER. ATTACH
BASE PLATE TO BOTTOM OF MAIN CHASSIS.
TILT ASSEMBLY UP & ONTO BASE.

STEP 2:
ATTACH DEVICE SHELF AND VANTAGE MOUNT 
W/ (4) WING BOLTS. INSTALL TRIPOD HEAD ON UPPER SHELF
USING 3/8’’ BOLT.

STEP 3:
ADJUST LEVELERS AS NEEDED. POSITION TOWER IN
DESIRED LOCATION. BOLT TO FLOOR THROUGH 2
HOLES IN BASE PLATE. CONSULT LOCAL CONTRACTOR
TO DETERMINE CORRECT TYPE OF FLOOR ANCHOR 
DEPENDING ON BUILDING CONSTRUCTION.

STEP 4:
INSERT POWER CORD INTO HOLE IN BACK OF CHASSIS & 
PLUG INTO MODULE. TURN ON POWER SWITCH. OPEN 
BACK DOOR W/ KEY. TURN ON COMPUTER SWITCH. 
CLOSE & LOCK BACK DOOR.

ANCHOR TO FLOOR

5600 Airport Blvd

Boulder, CO 80301

www.retul.com

BASE SHOULD BE INSTALLED
WITH 2 EXTRA HOLES ON BACK 
OF TOWER

REPLACEABLE FUSE
250VAC 4A, 5X20MM

FUSED NEUTRAL

HAZARDOUS VOLTAGE
ENCLOSED. DISCONNECT
ALL POWER BEFORE
SERVICING.

INPUT: 100-240V~50-60Hz 3.5A 

DISCONNECT: ADJUST POWER SWITCH TO OFF
POSITION OR REMOVE POWER CORD. 

ELECTRICAL:

Reviews: