1. HARNESS FITTING
Place
•
users foot (or shoe) on foot plate and set the webbing bridges clear of the foot
(Fig.1a), in line with the ankle bone.
Drill
•
4 holes in each foot plate to suit either fixing method (Fig.1b & 1c). Attach
webbing bridges with fixings supplied & cut off any excess bolt for safety.
Slide
•
on the webbing Slides, place the Achilles on the foot plate & thread the webbing
under the webbing bridge and into Slide (see Fig.1e, stages 1-3). Note: Do not tighten
webbing at this point.
Fig.1a
Fig.1b
Fig.1c
Fig.1d
Fig.1e
Use 5mm drill
for nut &bolt
fixing
Use Suitable
drill for self
tapping screw
3
2
1