Speakman S-1498-LH Instructions Download Page 4

S-1496-AF  ROUGH-IN DIAGRAM

SPEAKMAN

®

DIMENSIONS SUBJECT TO CHANGE WITHOUT NOTICE.

NOTES:

COMPLIANCE:

CONNECTIONS:

ASME A112.18.1/CSA B 125.1

• Inlet: ½” NPT Female

• Outlets: ½“ NPT Male (Gooseneck)

Contractor to supply necessary inlet 
connections.

3 5

16 "

84mm

BODY WIDTH

AT INLETS

BACK VIEW

WITHOUT WALL

4'-6'

[1.37 meters]

TO FLOOR

  19 34 "

504mm

 

 

7 18 "

180mm

 

 

5 12 "

140mm

 

 

1in

25.4mm

 

 

6in

146mm

 

SIDE VIEW

WITH WALL

PIPE STRAP W/SCREWS
(LOCATION OPTIONAL)

FRONT VIEW

WITHOUT WALL

S-1498-LH  ROUGH-IN DIAGRAM

SPEAKMAN

®

DIMENSIONS SUBJECT TO CHANGE WITHOUT NOTICE.

NOTES:

COMPLIANCE:

CONNECTIONS:

ASME A112.18.1/CSA B 125.1

• Inlet: ½” NPT Female

• Outlets: ½“ NPT Male

Contractor to supply necessary inlet 
connections.

 

1"

25.4mm

 

 

5 34 "

146mm

 

  4 3

16 "

106mm

 

  32 1

16 "

815mm

 

  16 12 "

420mm

 

4'-6"

[1.37 METERS]

TO FLOOR

PIPE STRAP W/SCREWS
(LOCATION OPTIONAL)

Summary of Contents for S-1498-LH

Page 1: ...mperature 160 F FREEZE PROTECTION Freeze damage to the shower unit will void the Freeze damage to the shower unit will void the warranty It is important to winterize the complete warranty It is important to winterize the complete shower unit The unit must be drained of all water shower unit The unit must be drained of all water in freezing conditions This includes removing the in freezing conditio...

Page 2: ...2 Slide on the Dial Cap 1 onto the Bonnet Tighten in place with the Dial Cap Screw 2 Slide the Handle 3 onto the Valve post Then tighten with Handle Screw 1 10 Turn on water supplies Turn on Valve to the WARM position and flush for 1 minute 11 OPTION If your unit comes with shower head apply Thread Seal Tape to threads of Shower Arm 1 Thread Shower Head 2 onto Shower Arm 1 and tighten with Adjusta...

Page 3: ...e cover is on the hot supply side and the C on the cartridge cover is on the cold supply side 5 Make sure the Large Bonnet O Ring Seal is installed and seated properly in the Valve Body Reassemble the Valve Bonnet making sure the UP on the Bonnet is in the up position Tighten the 4 Bonnet Screws Turn ON the HOT COLD water supplies Check valve for leaks 6 To limit the maximum hot water temperature ...

Page 4: ...eters TO FLOOR 19 3 4 504mm 7 1 8 180mm 5 1 2 140mm 1in 25 4mm 6in 146mm SIDE VIEW WITH WALL PIPE STRAP W SCREWS LOCATION OPTIONAL FRONT VIEW WITHOUT WALL S 1498 LH ROUGH IN DIAGRAM SPEAKMAN DIMENSIONS SUBJECT TO CHANGE WITHOUT NOTICE NOTES COMPLIANCE CONNECTIONS ASME A112 18 1 CSA B 125 1 Inlet NPT Female Outlets NPT Male Contractor to supply necessary inlet connections 1 25 4mm 5 3 4 146mm 4 3 1...

Reviews: