INSTALLATION AND OPERATION
5.
Install the two 30" hoses to the remaining elbows in the valve followed by the two #3133
elbows. Connect these to the post master in the same location the power and return hoses
were removed. Check all connections for leaks.
PD4800 POST DRIVER VALVE INSTALLATION (Refer to the diagram and parts list in the
back of instructions.)
1.
Install valve mounting bracket to the top of the tilt attach using the .38" hardware sup-
plied. Secure the valve #2243 to the bracket using the .31" hardware supplied and install
the hose loop to the side of the tilt attach by removing one of the .50" X 1.00" capscrews
from the left side and replacing with the 1.25" capscrew supplied.
2.
Install elbows #3430 to the existing elbows on the tilt attach followed by the 45° end of the
16.5" hose and the 21" hose. Install straight adapters #62208 to the middle ports of the
valve and connect the 90° ends of the hoses coming from the tilt attach.
3.
Install straight connectors #30298 and #30289 to the right side ports in the valve followed
by one set of couplers, and straight adapters #3270 to the left ports of the valve.
4.
Connect the power and return hoses from the post driver to the couplers installed in Step
#3. Connect the 80" long hoses #35379 to the connectors on the left ports of the valve
followed by the remaining couplers. Route hoses through the hose loop and up to the
auxiliary hydraulics on the loader. Check all connections for leaks.
UNIVERSAL VALVE INSTALLATION (Refer to the diagram and parts list in the back of
instructions.)
1.
Install valve mounting bracket to the top of the tilt attach using the .38" hardware sup-
plied. Secure the valve #2243 to the bracket using the .31" hardware supplied and install
the hose loop to the side of the tilt attach by removing one of the .50" X 1.00" capscrews
from the left side and replacing with the 1.25" capscrew supplied.
2.
Install the 45° end of the 16.5" hose and the 21" hose to the elbows on the tilt attach. Install
straight adapters #62208 to the middle ports of the valve and connect the 90° ends of the
hoses coming from the tilt attach.
3.
Install elbows #3283 to the right side ports in the valve.
4.
Connect the electrical wiring on the diverter valve to the auxiliary electrical connector on
the skid steer loader or to the optional Spartan Equipment control box.
NOTE: The hoses going to the attachment will attach to right side ports of the valve. Attach
hoses going to the loader auxiliary hydraulics to the left side ports of the diverter valve.
Work with your local dealer to obtain appropriate hoses necessary to complete the
hydraulic circuit for the desired attachment hook-up.
WARNING! ALWAYS CHECK LOCKING MECHANISM (PINS) BEFORE TILTING OR OP-
ERATING ANY ATTACHMENT.
11067 7 -24-08-2
Summary of Contents for 112921
Page 2: ......
Page 4: ......
Page 12: ......
Page 15: ...12 MOUNTING KIT INSTALLATION HEAVY DUTY TILT ATTACH ASSEMBLY 17446 1 6 41 43 9318 1 14 08 2...
Page 16: ......
Page 17: ...13 7866 1 14 08 3 MOUNTING KIT INSTALLATION TILT ATTACH ASSEMBLY 87301...
Page 18: ......
Page 19: ...14 CYLINDER ASSEMBLY ASSEMBLY 87332 11064 1 14 08...
Page 21: ...15 MOUNTING KIT INSTALLATION VALVE KIT 87651...
Page 22: ...MOUNTING KIT INSTALLATION VALVE KIT 87651 7876 1 15 08 3...
Page 23: ...16 MOUNTING KIT INSTALLATION VALVE KIT 88725 9196 1 15 08 2...
Page 24: ...MOUNTING KIT INSTALLATION VALVE KIT 88725 9197 1 15 08 2...
Page 25: ...17 18...