Return the Server to the Normal Operating Position
Related Information
■
“Remove the Top Cover” on page 59
■
“Return the Server to the Normal Operating Position” on page 153
Return the Server to the Normal Operating Position
Caution -
The chassis is heavy. To avoid personal injury, use two people to lift the server and
set it in the rack.
1.
Release the slide rails from the fully extended position by pushing the release
tabs on the side of each rail.
2.
While pushing on the release tabs, slowly push the server into the rack.
Ensure that the cables do not get in the way.
3.
Reconnect the cables to the rear of the server.
Returning the Server to Operation
153
Summary of Contents for S7-2L
Page 1: ...SPARC S7 2L Server Service Manual Part No E73201 04 March 2017...
Page 2: ......
Page 10: ...10 SPARC S7 2L Server Service Manual March 2017...
Page 26: ...26 SPARC S7 2L Server Service Manual March 2017...
Page 44: ...44 SPARC S7 2L Server Service Manual March 2017...
Page 61: ...Remove the Fan Cover Use a T6 Torx screwdriver Preparing for Service 61...
Page 64: ...64 SPARC S7 2L Server Service Manual March 2017...
Page 76: ...76 SPARC S7 2L Server Service Manual March 2017...
Page 86: ...86 SPARC S7 2L Server Service Manual March 2017...
Page 156: ...156 SPARC S7 2L Server Service Manual March 2017...