www.spacelabshealthcare.com
4 - 2 3
9 1 3 9 0
Q U B E
M
A I N T E N A N C E
Connector Board PCB
1
Perform
access the Main Chassis assembly.
2
Remove the three screws, shown in
for option A.
Remove the two screws for options B or C.
Figure 4-18 Connector Board PCB
Note:
Loosen the top three Monitor Dock PCB screws.
3
Remove the Connector Board.
4
Install the new Connector Board making sure that the connection
to the interface PCB is good.
Note:
Tighten the top three Monitor Dock PCB screws.
5
Connect board to the Interface PCBA. Connect to Monitor and
Dock boards.
6
Install the three screws removed in step 2 for option A. Install the
two screws removed in step 2 for options B or C.
Remove
Loosen
Connector Board
Remove
Interface PCBA
Summary of Contents for qube 91390
Page 1: ...S E R V I C E M A N U A L 070 2451 01 Rev F www spacelabshealthcare com October 2014 91390...
Page 24: ...www spacelabshealthcare com 1 18 91390 Q U BE I NT R O D U C T IO N...
Page 42: ...www spacelabshealthcare com 2 1 8 91390 Q U BE SE TU P...
Page 54: ...www spacelabshealthcare com 3 1 2 91390 Q U BE T H EO R Y...
Page 90: ...www spacelabshealthcare com 4 3 6 91390 Q U BE M AI N T E N A NC E...
Page 120: ...www spacelabshealthcare com 5 3 0 91390 Q U BE TRO U B L E S H O O T IN G...
Page 160: ...www spacelabshealthcare com B 2 0 91390 Q U BE AP P E N D IX B SY M B O LS...