45.
A minimum clearance of 6 inches must be maintained between the outside wall and vent cap (18
”
clearance will provide stability under high wind conditions).
46.
The horizontal venting system shall not terminate:
•
Less than 4 ft. (1.2m) below, 4 ft. (1.2m) horizontally from or 1 ft. (30cm) above any door, operable
window or gravity air inlet into any building. The bottom of the vent terminal shall be located at least 7
ft. (2.1m) above grade or above snow accumulation level as determined by local codes.
•
Less than 3 ft. (0.9m) from a combustion air inlet.
•
Less than 3 ft. (0.9m) from any other building opening or any gas service regulator.
•
Less than 7 ft. (2.1m) above public walkways.
•
Directly over areas where condensate or vapor could create a nuisance or hazard or be harmful to the
operation of gas utility meters, regulators, relief valves, or other equipment. Building materials should
be protected from flue gases and condensate.
•
Less than 18” (0.45m) when directly below a combustible overhang.
47.
In regions of the country where prevailing winds are consistently higher than 40 mph, it may be necessary to
terminate the vent system above the roof level.
Summary of Contents for PGR 100-L5
Page 47: ...Form 43343120 46 July 2021 18 0 CONTROL COMPONENT LOCATION ...
Page 49: ...Form 43343120 48 July 2021 20 0 TROUBLESHOOTING GUIDE SINGLE STAGE N5 L5 ...
Page 50: ...Form 43343120 July 2021 49 TROUBLESHOOTING GUIDE SINGLE STAGE CONTINUED ...
Page 51: ...Form 43343120 50 July 2021 TROUBLESHOOTING GUIDE SINGLE STAGE CONTINUED ...
Page 52: ...Form 43343120 July 2021 51 20 8 TROUBLESHOOTING GUIDE TWO STAGE N7 L7 ...
Page 53: ...Form 43343120 52 July 2021 TROUBLESHOOTING GUIDE TWO STAGE CONTINUED ...
Page 54: ...Form 43343120 July 2021 53 TROUBLESHOOTING GUIDE TWO STAGE CONTINUED ...