MC-MP-SBD Owner’s Manual
18
Standard floor
installation
procedure
The MC-MP-SBD provides for versatile installation: brackets
allow wall installation and special mounting foot floor
installation. In both cases a special plastic guide plate facilitates
installation.
Power Box
Installation
1• Select most appropriate
location on floor for
spa pack and firmly
attach guide plate to
wooden base with
3 standard screws.
2• Slide back side of the
unit's mounting foot
into guide plate. It
should slide into place
easily.
3• Now firmly attach unit
to wooden base by
using two screws to fix
the front side of the
foot.
Summary of Contents for MC-MP-SBD
Page 7: ...Notes ...
Page 27: ...MC MP SBD Owner s Manual 26 Notes ...
Page 29: ...MC MP SBD Owner s Manual 28 Notes ...
Page 31: ...MC MP SBD Owner s Manual 30 Notes ...
Page 41: ...MC MP SBD Owner s Manual 40 Notes ...