16
Customer Helpline
0345 640 0800
Start- up
ON/OFF Operation
Emptying the Collection Bag
Overload Protection
Restart Prevention
Operation
Check that the mains voltage matches the rating on the name plate.
Hook the collection bag
4
into the bag mounts
3
.
If your shredder is fitted with a long mains cable, plug it directly into the mains supply, using an RCD
device if necessary.
Connect the extension cable.
Make sure that the funnel feeder is empty.
•
Set the On/Off switch
10
to “ON” to turn on the unit. Feed the material to be shredded into the
opening of the hopper. The material is drawn in and shredded.
•
Set the On/Off switch
10
back to “OFF” to turn off the unit. The shredder will continue to run for a
few seconds after switching off.
Avoid filling the collection bag too much. Mind that the bag will fill unevenly under the discharge duct!
•
Turn off the unit.
•
Remove and empty the collection bag
4
.
In the event of overload, e.g. due to branches that are too thick, the equipment automatically switches
off.
To restart the unit, wait a few minutes for the motor to cool down, press the Reset button
8
, then
turn on the unit.
The unit will not automatically restart when the power returns after a power cut. To restart the unit, turn
the on/off switch to “off“ then back to “on“.