Page 11 of 21
Installation & Adjustment Procedures
Figure 9: Sling Attachment
4.5. Mount the disconnect switch to the structure using the hardware indicated by the
Operating Mechanism drawing (see
4.6. The Mounting Positions and Proper Blade Openings are shown in
Figure 10: Proper Mounting Positions
4.6.1. Conventional blade open positions are shown in
. The EV-2H switch
will be shipped with one of these blade open angles unless another angle is
specified. Slight changes to the blade fully open angles are easily made in the
field. Simply adjust the open position stop bolt on the blade carrier assembly
shown in
, and then readjust the stop located at the bottom of the
rotating insulator to match the blade angle.