P
LATINUM
S
ERIES
S
ECTIONAL
R
ANGE
I
NSTALLATION
I
NSTALL AND
O
PERATIONS
M
ANUAL
1185836 R
EV
3 (07/06)
P
AGE
25
OF
80
Figure 12
Removal of Shipping Hold-Down Brackets
Shipping
Hold-Down
Brackets
S
TEP
2
A
: A
TTACH
L
EGS TO THE
R
ANGE
A set of four legs is packed with units ordered with legs. (For units ordered with casters, go to Step 2b.)
A threaded leg pad is fastened to the base frame at each corner. Each leg has a corresponding mating thread. The
legs can be adjusted to overcome a slightly uneven floor.
1. Raise the range sufficiently to allow the legs to be attached. For safety, “shore up” and support the range with an
adequate blocking arrangement strong enough to support the load.
2. Screw the legs into the holes in the centers of the leg pads (see Figure 13).
3. Lower the range gently onto a level surface. Never drop or allow the range to fall.
4. Go on to Installation Step 4.
Figure 13
Installation of Legs