I
NSTALLATION
E
LECTRIC
C
ONVECTION
O
VENS
P
AGE
14 O
PERATOR
’
S
M
ANUAL
1181958
INSTALLATION
8. Insert two bolts (items “A” in the following diagram) up through the top of the lower oven and screw
them into the threaded holes in the bottom of the top oven. Tighten these bolts and the screws that you
did not tightened in the previous step.
A
9. Replace the right side insulation, exterior panel, and lower front panel that you removed in steps 3, 4,
and 5 of this procedure.