Quick-Check-PowerSaver Manifold 6 Port South-Tek Systems
Revision: 0
Revision Date: 8/2/17
Page 23 of 30
Figure 19: Zone Setup Screen
7.
Change the “Number of Active Zones” in “Zone Setup” which can be accessed through the “Menu” or the
“Legend” button. Press inside the box to change the number to the number of zones that will be required for the
system. This screen can be seen in Figure 19.
8.
(Optional) Change the name of the zones in “Zone Setup” which can be accessed through the “Menu”. The user
can press any zone to change each to a more descriptive name of up to 8 characters.
7.1.2
Initial System Purge
When a Fire Protection System is first filled with nitrogen, it mixes with the atmospheric air already within the pipes
and fittings. In order to get the pipes down to an acceptable purity level, the AutoPurge System should be used. The
Quick-Check’s PowerSaver Manifold will vent out a small amount of gas to eventually lower the oxygen purity to an
acceptable level. To account for the amount of time it will take for the system to get within the parameters of the
setpoint, the user can engage the Initial System Purge which will allow a default of 40 days of purging without alarm.
To set up the Initial System Purge, open the “Zone Setup” screen found in the “Menu”, then press “Start-Up Settings”
and the screen in Figure 20 figure below will be displayed. The user must turn the Initial System Purge on with the
selector switch to the right of the “Initial System Purge (Days)” to start it. Before conducting this step, the Initial
System Purge(Days) can be set by the user by pressing in the box next to it (factory default is set to 40 days).
This feature will automatically turn off once the “Days left in Initial System Purge” reaches 0, but it may be turned off
manually at any point by pressing the toggle switch again.
7.1.3
Normal Start-up
Follow this procedure to start the Quick-Check for normal operation. If this is the first time the unit has been started,
follow the Initial Start-Up procedure above, otherwise:
1.
Open all APS zone ball valves and ensure all APS flow tuning is correct according to the APS Tuning Sheet.
2.
Toggle the “ON/OFF” button on the “Home” screen to the “ON” position to start the system
Figure 20: Initial System Purge