After  the  nitrogen  storage  tank  is  depleted  down  to  the  cut-in 
pressure  (~60  PSIG)  the  generator  will  turn  back  on  and  refill  the 
system. 

 

3.4

 

STARTING & STOPPING 

 

To 

start 

the 

generator simply push the green 
power switch on the front of the 
generator to the ON(up) position. 

Note:  On  startup  the  generator 
will  have  a  12  second  delay 
before 

the 

compressor 

operates.  This  is  designed  to 
prevent 

damage 

to 

the 

compressor. 

 

At  this  point  the 

power  switch  will  be  illuminated 
and  the  generator  will  be 
operating normally. 

 

The  system  has 

two  main  run  modes 

  Run  and 

Standby. 

When 

the 

green 

(Operate)  power  switch  is  turned  on  and  illuminated,  the  internal 
controller will automatically determine which mode to enter. 

 

If the BrewBlast

™ 

is in run mode, the standby light will be off and the 

nitrogen generator will be filling the storage tank with nitrogen. 

 

If  the  BrewBlast

  is  in  standby  mode,  the  standby  light  will  be 

illuminated;  the  nitrogen  generator  will  be  off  and  waiting  until  the 
storage tank pressure drops the cut-in pressure to turn back on. 

 

If the 

BrewBlast™ 110CPH

 runs continuously for more than 9 hours, 

the  BlastOff  Alarm  will  shut  down  the  generator  (see: 

4.2 

for  more 

details) 

 

 

Summary of Contents for BREW BLAST 110CPH

Page 1: ...The Leader in Nitrogen Generation Technology 110CPH Quick Start Guide Version 0 06 29 2018 2020 ...

Page 2: ...BrewBlast 110CPH Specifications Nitrogen Purity 99 7 Installation Lockable Swivel Caster Wheels Display Hours Run Standby Filter Alarm BlastOffTM N Storage Pressure 60 90 PSIG Cabinet Port Connections Industrial Quick Coupler with 1 4 MNPT Plug Electrical 110V 60Hz 1Phase 10A Fuse Compressor Integral Oil Free Ambient Temperature 40 to 90 F Noise Level dbA 85 dbA Size 20 L x 9 W x 26 H Cabinet Dime...

Page 3: ...South Tek Systems Version 0 Revision Date 6 29 18 Page 3 of 18 Notes ...

Page 4: ...1 3 Important Information 5 2 SAFETY GUIDELINES 6 2 1 General 6 3 INITIAL START UP 7 3 1 Electrical Connections 7 3 2 Nitrogen Drain Connections 8 3 3 Turning on the Generator for the First Time 9 3 4 Starting Stopping 10 4 SYSTEM OPERATION 11 4 1 Instructions 11 4 2 Alarms and Alarm Indicator Lights 11 5 SYSTEM MAINTENANCE 13 ...

Page 5: ...d shelf life The N2 is generated by our membrane technology where compressed air is forced through a separation media and O2 is exhausted to atmosphere and N2 is allowed to pass through to process 1 2 AUDIENCE This manual is intended for Installer Restaurant Bar Operator Supervisory Staff and should be read in its entirety prior to operation Please contact your local provider for any operation and...

Page 6: ...n of the nitrogen generator Blocking vents can cause excess heat to build in the nitrogen generator cabinet All personnel involved with installation operations and maintenance of the BrewBlast 110CPH must follow safe working practices OSHA and local health safety code regulations during the installation operation and maintenance of the unit Warning This guide must be read in its entirety prior to ...

Page 7: ...ey can be used to connect to an audible or visual alarm indicator or run to a building management device These contacts are rated for a maximum of 1A at 5 27VDC 5 240VAC Follow local and site regulations when wiring these connections The yellow wire acts as the common which will supply power to the NO or NC depending on alarm status If an alarm is triggered including BlastOff filter replacement an...

Page 8: ...sleeve on the nitrogen outlet quick coupler while pushing the quick coupler plug into the coupler Once in place release the quick coupler sleeve to lock the plug into the coupler The condensate drain connection is a OD push to connect fitting this fitting can be connected to an external drain to drain off the water accumulated in the filter bowls The filter bowls drain automatically when enough wa...

Page 9: ...oint the power switch should be illuminated designating the system is operating and the generator will start filling the internal storage tank It is suggested that the system plumbing leading to the cold brew system be purged with the nitrogen being generated in the initial start up for at least 15 minutes to ensure the best purity of nitrogen for pouring Watch the system fill and fix any leaks de...

Page 10: ...illuminated and the generator will be operating normally The system has two main run modes Run and Standby When the green Operate power switch is turned on and illuminated the internal controller will automatically determine which mode to enter If the BrewBlast is in run mode the standby light will be off and the nitrogen generator will be filling the storage tank with nitrogen If the BrewBlast is...

Page 11: ...his manual The system is design for 24 hour operation but routine maintenance on the filters must be performed See section System Maintenance for detail maintenance instructions 4 2 ALARMS AND ALARM INDICATOR LIGHTS Filter Alarm All BrewBlast 110CPH comes standard with a Filter Alarm notification The Alarm indicator light will illuminate continuously when the filter change is overdue It is recomme...

Page 12: ...it Once a leak has been detected the BlastOff illuminates the BlastOff light in red on the control panel and shuts down the BrewBlast 110CPH until the problem has been remedied and the alarm has been reset To reset the BlastOff simply turn off the BrewBlast 110CPH using the green toggle switch and turn it back on Never reset repeatedly if the BlastOff goes off daily there is a real potential issue...

Page 13: ...button Annual Filter replacement kit part FRP 001 Air Intake Filter The integrated air compressor has an air intake filter mounted on top It is design to prevent particles from entering into the compressor housing and damaging internal components This filter needs to be replaced once per year or every 1000 hours whichever comes first To do so remove the air intake filter cap by twisting it clockwi...

Page 14: ...South Tek Systems Version 0 Revision Date 6 29 18 Page 14 of 18 clean dry cloth to clean the filter enclosure before installing the new element ...

Page 15: ...eplace the old O rings with the ones provided in the kit 5 Pull the black plastic element holder out of the filter bowl Carefully twist the two sides of the black plastic cover apart and pull out the white particulate filter element Install the new element in the reverse order 6 The coalescing element can be removed by turning it counter clockwise by hand install the new element in the reverse ord...

Page 16: ...o a different specification at the factory s option Any work performed by an unauthorized person company or usage of non factory parts may void all warranties to the product Any item not manufactured by South Tek may carry its own warranty from its manufacturer and will be warrantied by that manufacturer All parts that need to be returned should be announced Any item s that is returned to South Te...

Page 17: ...South Tek Systems Version 0 Revision Date 6 29 18 Page 17 of 18 Wilmington NC 28405 ...

Page 18: ...South Tek Systems Version 0 Revision Date 6 29 18 Page 18 of 18 Last Page ...

Reviews: