![South Pacific Industrial DW1100 Owner'S Installation & Operations Manual Download Page 3](http://html1.mh-extra.com/html/south-pacific-industrial/dw1100/dw1100_owners-installation-and-operations-manual_1336511003.webp)
2
III
SPECIFICATIONS
South Pacific Industrial Pty Ltd reserves the right to alter or change specifications without notice.
IV INSTALLATION
1. PLANE
a. First of all, a suitable bow roller must be installed to support the
anchor, chain and rope.
b. A bollard or snubbing device should be installed between the bow
roller and winch to tie the rope on while being anchored or
securing the anchor in the fully raised position.
2. CONSTRUCTION
a. You may install the winch on the deck or inside the anchor well.
If the winch has been installed inside the anchor well, a roller
may needed between the bow roller and the winch to prevent the
rope/chain from scratching the deck. Also, you can adjust the
motor/gear box position to fit inside the anchor well. Refer to the
photo below.