![Soozier A90-197 Instructions Download Page 5](http://html1.mh-extra.com/html/soozier/a90-197/a90-197_instructions_1332403005.webp)
Assembly step 2:
1. Insert (06) cushion lift tube into (01) main frame. Screw up (12) pull knob.
2. Lock the cushion (08) on the cushion installation seat (07), and locked on the (06)
cushion lift pipe by the (13) knob.
3. Lock the left and right pedal on the (01) main frame respectively.
(Pay attention to
distinguish the left and right pedal, the R tag on the foot corresponding to
the R tag on the frame, L to L, and then screw tightly according to the
direction of the whorl on the pedal)
Assembly step 3:
1. Insert the (04) handlebar lift tube
to the (01) main frame . Lock the (17)
locking knob.
2. Install the (05) handlebar tube on
the (04) handlebar lift tube by (20)
bolt, (21) spring washer
3. Install the (09) electronic meter on
(05) the electronic meter pedestal
Please note: it is necessary to unify
all bolts after confirming that all
the requirements are installed
according to requirements above.