2-15
2-3-17 Lever Up Down Ass’y, Gear Center
Ass’y Removal
1) Remove the 2 hooks in the direction of arrow as shown Fig. 2-26
and lift the Lever Up Down Ass’y
1
.
2) Lift the Gear Center Ass’y
2
.
Assembly:
1) Insert the Lever Up Down Ass’y
1
in the rectangular holes on
Main Base as shown in Fig 2-28.
2) Lift the Lever Up Down Ass’y
1
about 35°.
(Refer to Fig 2-28)
3) Insert Ring of the Gear Center Ass’y
2
in the Guide of the Lever
Up Down Ass’y
1
.
4) Insert the Gear Center Ass’y
2
in the post on Main Base.
5) Push down the Lever Up Down Ass’y
1
for locking of the Hook.
Note:
1) Take care not to separate and sentence does not mark sense.
2) Be sure to confirm that Ring of the Gear Center Ass’y
2
is in the
Guide of the Lever Up Down Ass’y
1
after finishing assembly of
Lever Up Down Ass’y
1
and Gear Center Ass’y
2
.
Fig. 2-27 Lever Up Down Ass’y Removal
Fig. 2-28 Lever Up Down Ass’y Removal
2-3-18 Guide Cassette Door Removal
1) Lift the Hook [A].
2) Rotate the Guide Cassette Door
1
in the direction of arrow.
Note:
After reinstalling the Guide Cassette Door
1
sure the Hook
[A].
Fig. 2-29 Guide Cassette Door Removal
1
LEVER UP DOWN ASS`Y
2
GEAR CENTER ASS`Y
MAIN BASE
LEVER UP DOWN ASS'Y
35
1
GUIDE CASSETTE DOOR
HOOK [A]
www. xiaoyu163. com
QQ 376315150
9
9
2
8
9
4
2
9
8
TEL 13942296513
9
9
2
8
9
4
2
9
8
0
5
1
5
1
3
6
7
3
Q
Q
TEL 13942296513 QQ 376315150 892498299
TEL 13942296513 QQ 376315150 892498299