Mounting
9
GB
4
Remove the cable cover of the
monitor.
5
Connect the cable between the IP
converter and monitor.
6
Connect all the required
communications cables to the
monitor.
When bundling and routing
cables, do not place any
excessive load on the cables.
Attaching the Arm Bracket
1
Align the four M4 screw holes of
the ceiling suspension arm and
the arm bracket, and attach the
bracket using four M4 screws (not
supplied).
Prepare screws of the appropriate
length by referring to
ceiling suspension arm and arm
2
Hook the groove (A) of the
monitor bracket over the shaft (B)
of the arm bracket.
3
Rotate the monitor bracket
around the shaft of the arm
bracket so that the brackets are
slightly open, and secure the
brackets in position using two of
the M4 screws (large) removed in
step
1
Converter to the Monitor Bracket”
.
Secure using the screws before
routing the cables. If cables are
routed without securing the
Note
0071.ai
Cable cover
Caution
(A)
(B)
Summary of Contents for NUA-BK30
Page 5: ...ご利用にあたっての指示 用途 5JP MR Magnetic Resonance 環境では使 用しないでください 故障や火災 予測不能な移動を引き起こ す可能性があります 157 注意 ...
Page 19: ...主な仕様 19JP ...
Page 35: ...Specifications 17GB ...
Page 115: ...Especificações 17PT ...
Page 163: ...Tekniset tiedot 17FI ...
Page 179: ...Spesifikasjoner 17NO ...
Page 195: ...Specifikationer 17SE ...
Page 229: ...Προδιαγραφές 19GR ...
Page 273: ...사양 15KR ...