– 8 –
KV-AR25M86
RM-993
1-8.
H1 AND H2 BOARDS REMOVAL
1-9.
A AND B8 BOARDS REMOVAL
1-7.
P5 BOARD REMOVAL
1
P5 Board
2
V1 Board
5
Cover, H
4
H2 Board
6
Two hooks
3
Four hooks
1
H1 Board
2
Two screws
(Washer head)
(+BVTP 3x12)
3
Three screws
(3
×
12)(+) BVTP
2
Two hooks
1
Three
connectors
6
Four hooks
7
A Board
5
B8 Board
4
One screw
(3
×
12)(+) BVTP