– 2 –
• The equipment can be removed using the following procedure.
SECTION 1
DISASSEMBLY
Note : Follow the disassembly procedure in the numerical order given.
1-1. CABINET (REAR) SUB ASSY, CABINET (FRONT), MAIN BOARD
Set
Cabinet (Rear) Sub Assy,
Cabinet (Front), Main Board
Motor Assy, Turn Table
(Spindle) (M901)
“Motor Assy, Sled (M902)”,
Optical Pick-up (DAX-23E)
Switch Unit
MD Assy
1-2. MD ASSY
4
screws (B2)
6
9
2
screw (B2)
1
lid. battery
3
knob (open)
8
FLEXIBLE board (CN801)
0
MAIN board
7
cabinet (front)
lid, upper
5
claws
qa
cabinet (rear) sub assy
5
claws
5
claws
5
claws
4
1
CN502 (red)
2
CN503 (white)
5
MD assy
3
optical pick-up flexible board
MAIN board