DSC-W510
1-6
qs
Match three ditches of the Fixed Stationary Tube Block to three convex parts of the Straight Tube Lubricated Assy and install it.
qd
Install the Naruto Gear Lubricated Assy on the Fixed Stationary Tube Block.
qg
Pass the Flexible Board through the hole of the Fixed Stationary Tube.
qf
Rotate the Naruto Gear Lubricated Assy and the lens is drawn out.
qh
Rotate the Naruto Gear Lubricated Assy and the lens is retractile.
Eyepiece Side View
Straight Tube
Lubricated Assy
Fixed Stationary Tube Block
Fixed Stationary
Tube Block
Fixed Stationary
Tube Block
Ditch
Convex Part
Flexible Board
Fixed Stationary Tube
Naruto Gear Lubricated Assy
Naruto Gear
Lubricated Assy
qj
Install the Warm B Lubricated Assy.
qk
Connect the Iris Flexible Board from connector of 2 Frame Assy.
w;
Install the 3 Group Frame.
ql
Install the 3 Group Spring.
wa
∗
Tightening torque = 0.049
±
0.01N•m (0.5
±
0.1kgf•cm)
Install the Rear Mirror Plate with the four screws in the order of numbers.
Warm B
Lubricated Assy
Screw
Screw
Screw
Screw
Rear Mirror Plate
3 Group Frame
3 Group
Spring
3 Group Frame
3 Group Spring
4
1
2
3
Iris Flexible Board
Flexible Board
of 2 Frame Assy
ws
Perform the Flange Back Adjustment after the assembling.