– 5 –
SECTION 3
DISASSEMBLY
Note :
Follow the disassembly procedure in the numerical order given.
r
The equipment can be removed using the following procedure.
3-1. CABINET (FRONT), CABINET (REAR), SW BOARD
3-2. BATT BOARD, TUNER BOARD, AC INLET BOARD, POWER BOARD
5
BVTP (2.6X8)
Cabinet (Front)
SW board
4
1
2
3
BVTP (3X14)
3
Screws
+BVTP (3X14)
Cabinet (Rear)
6
BATT board
Power board
AC inlet board
1
2
8
7
Screws
+BVTP (3X10)
5
Screw +BVTP (3X10)
Cabinet (Rear)
Tuner board
6
3
Tuner retainer board
4
Screw
+BVTP (3X10)
Cabinet (Upper)
Optical pick-up section
Mechanism deck
SW board
Main board, CD motor board
REC SW board
BATT board, Tuner board, AC inlet board, Power board
Cabinet (Front)
Cabinet (Rear)
Set