Tel: +44 (0)1732 861200 - E-mail: [email protected] - Web: www.sontay.com
© 2017 Sontay Limited. All rights reserved
Page 4 of 4
RE-1P-2
1-Phase Din-Rail Mount 2kW
Issue Number: 7.1
Date of Issue: 28/04/2020
Four Elms Road
Edenbridge
Kent
TN8 6AB
UK
Whilst every effort has been made to ensure the accuracy of this specification, Sontay cannot accept responsibility for damage, injury, loss or expense
from errors or omissions. In the interest of technical improvement, this specification may be altered without notice.
Operation, Installation & Configuration (continued)
Cycle Time
The unit is supplied with the cycle time set to minimum (fully anticlockwise). An on board potentiometer is provided to facilitate adjustment of the cycle
time in the range of 5 (default) to 60 seconds. Adjustment is not normally required, incorrect adjustment can cause an overload condition.
Maximum Heating Load
The power rating of the units are given as a guide. The maximum current (which is dependent on the actual supply voltage and heating load) must not be
exceeded.
Jumper Settings & Connections
Voltage inputs:
Current inputs:
0-10Vdc 0-5Vdc
2-10Vdc
1-5Vdc
4-20mA 2-10mA 0-20mA 0-10mA
I/V Jumper
I/V Jumper
C
o
nt
ro
l Si
gna
l
0V
NO
C
O
NN
EC
TIO
N
NO
C
O
NN
EC
TIO
N
24V Al
ar
m
(
o
ut
pu
t)
0V Al
ar
m
(
o
ut
pu
t)
230Vac Load