background image

Instructions | for authorised electricians

sonnenBatterie pro 2.0

KD-523 • Part no. 22375 • Version X00

[email protected] • 

sonnen.de

Summary of Contents for sonnenBatterie pro 2.0

Page 1: ...Instructions for authorised electricians sonnenBatterie pro 2 0 KD 523 Part no 22375 Version X00 info sonnen de sonnen de ...

Page 2: ...33 444 Email info sonnen de Document Document number 523 Part number 22375 Version X00 Valid for ALL Publication date 06 09 2018 IMPORTANT Read this documentation carefully before installation operation Retain this document for reference purposes EN Instructions sonnenBatterie pro 2 0 ...

Page 3: ... 3 1 Selecting the installation location 9 3 2 Observing minimum distances 9 3 3 Installing the storage systems 9 4 Electrical installation 10 4 1 General information about installation 10 4 2 Selecting the measurement concept 10 4 3 Wiring the components 11 4 4 Electrical connection 12 4 4 1 Connecting the mains line 12 4 4 2 Connecting the Ethernet lines 12 4 4 3 Connecting the Modbus line 12 4 ...

Page 4: ...re must only be performed by authorised electricians The section Display on the internet portal P 14 contains important information for the target groups operator and authorised electrician 1 3 Designations in this document The following designations are used in this document Complete designation Designation in this document sonnenBatterie eco 8 0 Storage system eco 8 0 sonnenBatterie pro 2 0 Stor...

Page 5: ...ation is not observed CAUTION Dangerous situation leading to potential injury if the safety information is not observed NOTICE Indicates actions that may cause material damage Important information not associated with any risks to people or property Symbol Meaning Work step 1 2 3 Work steps in a defined order ü Condition List Table 1 Additional symbols ...

Page 6: ...niature circuit breaker Type B 13 16 A sonnenBatterie pro consisting of 3 x eco 2 0 24 2 0 30 2 0 36 2 0 42 2 0 48 8 0 8 8 0 10 8 0 12 8 0 14 8 0 16 Battery data DC Cell technology lithium iron phosphate LiFePO4 Usable capacity 24 kWh 30 kWh 36 kWh 42 kWh 48 kWh Nominal voltage 51 2 V Current Max continous 75 A Short circuit current ISC 80 A Min number of battery modules 12 Max number of battery m...

Page 7: ...te LiFePO4 Usable capacity 20 25 kWh 27 kWh 33 75 kWh 40 5 kWh Nominal voltage 48 V Current Max continous 75 A Short circuit current ISC 90 A Min number of battery modules 9 Max number of battery modules 18 Dimensions Weight Storage system individual 186 67 23 Dimensions pro 2 0 186 271 23 cm2 Weight pro 2 0 393 kg 462 kg 531 kg 600 kg 2 Specificiation without the outer minimum distances to be obs...

Page 8: ...ete Connections such as the Modbus line or signal line are made on the master storage sys tem The storage systems are connected to each other by Ethernet cable An external switch is installed for this purpose to which all three storage systems are connected The switch is connected to the home network router If a router with a sufficient number of free slots is available the external switch can be ...

Page 9: ...n each case 3 2 Observing minimum distances 100 cm 5 cm 15 cm 35 cm 35 cm 50 cm Illustration 3 Minimum distances to neighbouring objects Observe the specified minimum distances to neighbouring system parts or objects The minimum distances ensure that there is sufficient heat dissipation the storage system doors can be opened easily and there is sufficient space for installation and maintenance wor...

Page 10: ...urrent device RCD marked in figure Circuit diagram overview electrical connection of the pro 2 0 P 11 If an RCD of the re quired type is already installed it is not necessary to install an additional RCD In the case of an existing installation of three eco 8 0 storage systems connected in par allel the installation of the power meters must be changed 4 2 Selecting the measurement concept The stand...

Page 11: ... or B16 3 Current transformer for generation L2 13 Master storage system 4 Current transformer for generation L3 14 Slave 1 storage system 5 Transformer interface for generation A1 15 Slave 2 storage system 6 Transformer interface for consumption A2 16 Bidirectional counter 7 Current transformer for consumption L1 17 Public electrical mains 8 Current transformer for consumption L2 18 Miniature cir...

Page 12: ...thernet lines The connection to the customer router is established via a switch If the customer router has a sufficient number of free slots the three storage systems can be connected directly to the router A switch is not necessary in this case Connect the Ethernet lines as shown in figure System components P 8 The Ethernet cables the switch and the router are not included in the scope of deliver...

Page 13: ... the sonnenBatterie pro button on the System selection page 4 Enter the activation code of the pro 2 0 and start the commissioning assistant 5 Run the commissioning assistant until it is fully complete 5 2 Commissioning existing systems In the case of systems that were previously three storage systems connected in parallel proceed as follows 1 Disconnect the power supply to the storage systems see...

Page 14: ...s for the relevant storage system To view the data for the sonnenBatterie pro 2 0 the system must be registered with the serial number of the master storage system The data for the entire pro 2 0 system such as the PV production consumption and discharge is displayed on the internet portal for the master In theory it is also possible to log in using the serial number of one of the slaves but pleas...

Page 15: ......

Page 16: ...sonnen GmbH Am Riedbach 1 D 87499 Wildpoldsried ...

Reviews: