80
2-14. Handle
2-14-1. Handle Upper Cabinet Assembly
Procedure
1. Remove the seven precision screws, and then lift the handle upper cabinet assembly.
2. Disconnect the flexible boards from the two connectors (CN3101, CN3002) on the HN-449 board.
3. Install the removed parts by reversing the steps of removal.
(A)
Precision screws
(P2 x 4)
Precision screws
(P2 x 4)
Precision screw
(P2 x 4)
HN-449 board
CN3002
CN3101
Handle upper cabinet assembly
Flexible boards