Platné od: 7.3.2017
Somati system s.r.o., Jihlavská 510/2c, 664 41 Troubsko
IČ: 29260159, DIČ: CZ29260159
tel: +420 547 427 011, www.somati-system.cz
13
7.
INSTALLATION OF BEARINGS AND ACTUATOR
1.
Gravity brake FG-1
2.
Bearing body
3.
Main roller (lamellas on the roller must be tied, lamellas off the roller are connected
with the roller)
The main roller with parts of the lamellas mount on top of the skeleton, which is already
attached to the ceiling.
1
3
2