background image

I

n st al

l

at i on   an d  O per

at i on   M an u

al

Sol

i s  Th

r

ee  Ph

ase  I

n ver

t er

(

1 0 0 -1 2 5)

K

G i n l

o n g

  Tech

n o l

o g

i es  C o .

,  Lt d.

G i n l

o n g

  Tech

n o l

o g

i es  C o .

,  Lt d.

N

o .

  5 7  Ji n t o n g

  R o ad,  B i n h

ai   I

n du

st r

i al

  P ark

,  Xi an g

sh

an ,  N

i n g

b

o , 

Z h

ej

i an g

,  3 1 5 7 1 2 ,  P.

R .

C h

i n a.

Tel

:

  + 8 6  (

0 )

5 7 4  6 5 7 8  1 8 0 6

Fax

:

  + 8 6  (

0 )

5 7 4  6 5 7 8  1 6 0 6

I

f   yo u   en co u

n t er

  an y  p r

o b

l

em   o n   t h

e  i n v ert er

,  p l

ease  f i n d  o u

t   t h

e  i n v ert er

  S/ N

 

an d  co n t act   u

s,  w

e  w

i l

l

  t ry  t o  resp o n d  t o  yo u

r

  q

u

est i o n   A SA P.

 

P l

ease  adh

ere  t o  t h

e  act u

al

  p ro du

ct s  i n   case  o f   an y  di screp an ci es  i n   t h

i s  u

ser

  m

an u

al

.

 

(

For

A u st r

al

i a)

Ver

  1

.

0

Summary of Contents for 100K-5G-AU

Page 1: ...stri alPark Xi ang sh an N i ng b o Zh ej i ang 31 571 2 P R C h i na Tel 86 0 574 6578 1 80 6 Fax 86 0 574 6578 1 60 6 I f you encou nterany prob l em on th e i nverter pl ease f i nd ou t th e i nve...

Page 2: ...ed u r e 6 2 Sh u tdow n procedu re 34 34 34 7 1 M a i n M en u 35 35 7 2 I n f o r m a t i o n 4 1 R S485 and PLC com m u ni cati on connecti on 2 6 7 N orm aloperati on 35 4 2 D R E D port connecti...

Page 3: ...i ng Brack et N u m b er 1 1 Hex ag on b ol t M 6 1 2 R em ark s 3 4 5 Fasteni ng screw 2 D C connector Userm anu al 2 0 1 1 2 3 4 AC Sw i tch o p ti o n a l 5 M anu al O N O FF D C SW I TC H O N O FF...

Page 4: ...ag e th e i nver ter sealw i th adh esi ve tape w i th th e desi ccant i nsi de th e b ox Stor e th e i nver teri n a cl ean and dr y pl ace f r ee of du st and di r t Th e stor ag e tem per atu r e m...

Page 5: ...spi te caref u lconstru cti on el ectri caldevi ces can cau se f i res D o not i nstal lth e i nverteri n areas contai ni ng h i g h l y f l am m ab l e m ateri al s or g ases D o not i nstal lth e i...

Page 6: ...e sou nd l evelf rom th e i nvertercan b e q u i te h i g h 3 2 Produ ct h andl i ng Fi g u re 3 3 Handl es u sed to m ove th e i nvertersh ow n ci rcl ed i n red 3 1 2 4 Ai rci rcu l ati on D o not i...

Page 7: ...l y Th e steps to m ou nt th e i nverterare l i sted b el ow 1 R ef erto Fi g u re 3 6 dri l lh ol es f orm ou nti ng screw s b ased on th e h ol e di am eterof b rack et u si ng a preci si on dri l l...

Page 8: ...Fi g u re 3 1 0 W rong i nstal l ati on Ang l e Th e steps to m ou nted to th e rack are l i sted b el ow 3 I nstal lm ou nti ng pl ate 1 R em ove th e b rack et and f asteners f rom th e pack ag i ng...

Page 9: ...2 Sw i tch th e D C I sol atorO FF 3 C onnect th e i nverterto th e g ri d 4 Assem b l e PV connectorand connect to th e I nverter I nverterdesi g n u ses PV styl e q u i ck connect term i nal Th e to...

Page 10: ...term i nal s M 1 0 To ef f ecti vel y protect th e i nverter tw o g rou ndi ng m eth ods m u st b e perf orm ed C onnect th e AC g rou ndi ng cab l e Pl ease ref erto secti on 3 4 3 C onnect th e ex t...

Page 11: ...h e D C and D C term i nall ab el s b ef ore connecti ng th ese condu ctors to th e term i nal s of th e i nverter 5 M easu re PV vol tag e of D C i npu t w i th m u l ti m eter veri f y D C i npu t c...

Page 12: ...ce m u st b e u sed b etw een th e i nverterand th e g ri d N O TE Use AL C U transf er b i m etal l i c term i naloranti ox i dant g rease w i th al u m i nu m cab l es and term i nal s Tab l e 3 2 R...

Page 13: ...i nalb l ock Th e torq u e i s 1 0 2 0 N m C ab l e speci f i cati on 70 38 56 45 C opper cored cab l e C ab l e ou terdi am eter m m Traverse cross secti onalarea m m 2 R ang e R ecom m ended 35 1 85...

Page 14: ...d connecti on pl ease ref erto 4 2 secti on I nverter PV Stri ng s I nverter PV Stri ng s I nverter PV Stri ng s I nverter PV Stri ng s G ri d Transf orm er PLC C C O D atal og g er D C AC PLC R S485...

Page 15: ...t to R J45 pl u g C or r espondenc e b et w een t he c ab l es and t he st i t c hes of pl u g Pi n 1 w h i te and orang e Pi n 2 orang e Pi n 3 w hi t e a nd green Pi n 4 b l u e Pi n 5 w h i te and...

Page 16: ...l th ou g h th e g ri d standard i s set at th e f actory i t i s essenti alth e g ri d standard b e veri f i ed f orth e cou ntry of i nstal l ati on b ef ore com m i ssi oni ng Th e m enu f orch ang...

Page 17: ...pol ari ty m ay dam ag e th ese protecti on ci rcu i ts and orth e i nverter 5 4 3 2 Leak ag e to g rou nd M easu re l eak ag e to g rou nd to ch eck f ora D C g rou nd f au l t 5 4 3 2 1 D etecti on...

Page 18: ...detects D C pow erth at i s w i th i n start u p and operati ng rang es th e i nverterw i l ltu rn on Af tertu rn on th e i nverterw i l lch eck i nternalparam eters sense and m oni torAC vol tag e h...

Page 19: ...I _D C 0 2 0 4 9A I _D C 2 0 0 5 2 A VPV_Total Sh ow s i npu t vol tag e total I PV_Total Sh ow s i npu t cu rrent total Tab l e 7 1 I nf orm ati on l i st Statu s G enerati ng Pow er 1 488W G ri d F...

Page 20: ...i x ed 7 4 2 R u nni ng M essag e Th i s f u ncti on i s f orm ai ntai nce person to g et ru nni ng m essag e su ch as i nternaltem peratu re Standard N o 1 2 etc Screens can b e scrol l ed m anu al l...

Page 21: ...or User D ef Usi ng th i s f u ncti on th e l i m i ts can b e ch ang ed m anu al l y Th ese vol tag e val u es are th e ph ase vol tag e Th e di spl ay sh ow s th e l atest w arn m essag es see Fi g...

Page 22: ...earE nerg y C l earE nerg y can reset th e h i story yi el d of i nverter Th ese tw o f u ncti ons are appl i cab l e b y m ai ntenance personnelonl y w rong operati on w i l lprevent th e i nverterf...

Page 23: ...i m u m pow er 7 5 6 C al i b rate E nerg y M ai ntenance orrepl acem ent cou l d cl earorcau se a di f f erent val u e of totalenerg y Use th i s f u ncti on cou l d al l ow u serto revi se th e val...

Page 24: ...rou tpu t energ y and vol tag e I t w i l lnot i m pact th e energ y cou nt f ori nverterw i th R G M Tw o secti ons are i ncl u ded Pow erParam eterand Vol tag e Param eter YE S E N T N O E SC Pow er...

Page 25: ...to th orou g h l y i nspect th e D C ci rcu i t to ensu re al lt h e cab l es are correctl y f astened O nce th e D C ci rcu i t i ssu e h as b een f i x ed ori t i s conf i rm ed to b e O K press E S...

Page 26: ...Th e du st can b e rem oved w i th a sof t b ru sh 8 1 Anti PI D Fu ncti on Sol i s Th ree ph ase I nverters i nteg rates opti onalAnti PI D m odu l e and i t can recover th e PI D ef f ect du ri ng n...

Page 27: ...i rem ents Bef ore del i veri ng to th e cu stom er th e i nverterh as b een su b j ected to severaltests to ensu re i ts opti m aloperati on and rel i ab i l i ty I n case of f ai l u re th e LC D sc...

Page 28: ...M PPTnu m b er M axi npu t stri ng s nu m b er R ated g ri d vol tag e Vol ts R ated g ri d ou tpu t cu rrent Am ps Pow erFactor at rated ou tpu t pow er M ax ef f i ci ency E U ef f i ci ency M odel...

Page 29: ...1 0 9 1 2 E N 61 0 0 0 6 2 4 A S N ZS4777 2 I E C 62 1 1 6 I E C 61 72 7 I E C 60 0 68 I E C 61 683 E N 50 530 D i m ensi ons W H D W ei g h t 84k g M ax D C i npu t vol tag e Vol ts M PPTvol tag e ra...

Reviews: