Dyaco Canada Inc. 2013 [email protected]
9
#68
. 5/16” x 5/8”
Hex Head Bolt (8 pcs)
#76
. 5/16” x 18 x 1.5T Flat
Washer (6 pcs)
#82
. 5/16” x 1.5T Split
Washer (2 pcs)
#83
. 5/16” x 19 x 1.5T
Curved Washer (2 pcs)
3
CONSOLE
MAST
HARDWARE
STEP 3
1.
Slide the Console Mast Cover (
31
) onto the Console Mast (
2
). Make
sure the plastic cover is in the correct orientation
2.
Feed the twist tie that is connected to the Computer Cable (
44
) and
Hand pulse Cable (
45
) through the bottom of the Console Mast (
2
)
and out through the opening at the top.
3.
Insert the Console Mast (
2
) into the receiving tube (make sure it is
oriented like the illustration; be careful not to pinch the cables
between the tubes, as damage to the electronics could occur) of the
Main Frame (
1
) with six Hex Head Bolts (
68
), four Flat Washers (
76
)
on the sides of the tube and two Curved Washers (
83
) on the front
of the tube. Tighten using the 12/14mm Wrench (
112
).
4.
Remove the white Styrofoam pad (factory installed to prevent bolts
from being accidentally dropped into the Bike).
5.
Remove the plastic tie that holds the plastic cover on the center of
the handlebar (
3
). Attach the Console Mast Handle bar Assembly (
3
)
onto the Console Mast (
2
) with two Hex Head Bolts (
68
), two Flat
Washers (
76
) and two Split Washers (
82
) using the 12/14mm
Wrench (
112
).