Connecting Cables to Inverter

Connecting Cables to  One Battery Module

IX

X

Connecting Cables to Two Battery Modules

XI

XII

Connecting Cables to Three Battery Modules

XIII

Connecting Cables to Four Battery Modules

XIV

Connecting Cables to Four Battery Modules

XV

Commissioning

If all batteries are used for the installation, follow these steps for
beginning operation.

614.00520.0

0

 

BMS to Inverter:  
BAT+ to BAT+(A:2m), 

BAT- to BAT-(B:2m),

CAN to CAN(D:2m)

spring

chamber

wire strands

DC plug housing(-) 

screw connection

DC socket h)

screw connection

Step2

Insert the stripped cable up to the stop (negative cable for DC plug(-) and

 

             positive cable for DC ) are live). Hold the housing on the screw 
             connection.
Step3

Press down the spring clamp until it clicks audibly into place (You should be

 

             able to see the fine wie strands in the chamber)

Step1. Strip the cable(A/B:2m) to 15mm.

Step4

Tighten the screw connection(tightening torque:2.0±0.2Nm)

Step2.

Step3.

Step 4.

+

-

BMS to Slave1: B+ to B+(C:1200mm), B- to B-(A1:690mm), COMM to COMM1(E:200mm)

Ensure that both ends of the cables are connected to the correct connector, which are on the  

  

  right side of the BMS and battery module. 

Ÿ

Slave1

Slave2

BMS

BMS to Slave1: 
B+ to B+ (C:120mm); 
COMM to COMM1 (E:0.2m)

BMS to Slave2: 

B- to B- (A1:690mm)

Slave1 to Slave2: 

B- to B+ (A1:690mm); COMM2 to 

COMM1 (B1:600mm)

Install a fixed wall bracket on the battery module, and then

check to make sure the connections 

 are securely locked.

Connecting Cables to Three Battery Modules

Install a fixed wall bracket on the battery modules and the cover plate of the third battery module. 

BMS to Slave1: 
B+ to B+ (C:120mm); COMM to 
COMM1 (E:200mm);

BMS to Slave3: 

B- to B- (A1:1.8m); Get the cables 

through corrugate pipe.

Slave1 to Slave2:
B- to B+ (A1:690mm); COMM2 to 
COMM1 (B1:600mm)

Slave2 to Slave3: 

B- to B+ (A2:1.2m); COMM2 to COMM1 

(B2:1.2m); Get the cables through 

corrugate pipe.

Install the fixed wall brackets on the battery modules

And then

check to make sure the connections are securely locked.

BMS to Slave1:
B+ to B+ (C:120mm);COMM to COMM1 (E:200mm);

BMS to Slave4:

B- to B- (A3:1.2m), Get the cable through corrugate pipe.

Slave1 to Slave2:
B- to B+ (A1:690mm);COMM2 to COMM1 (B1:600mm);

Slave2 to Slave3:
B- to B+ (A3:1.2m);COMM2 to COMM1 (B2:1.2m);

Slave3 to Slave4:

B- to B+ (A1:690mm) and COMM2 to COMM1 

(B2:1.2m). 

Get the cables through corrugate pipe.

Verify the model number of each battery module to ensure that

they are all

the  

same model. 

Once all battery module(s) are installed, follow these steps for beginning operation:

1) Open the cover board of the

BMS 

2) Move the circuit breaker switch to the

ON position

3) Press the POWER button

to turn on the T-BAT system

4) Turn on the AC switch of inverter 

B+

B-

COMM1

(2) 

(1) 

(3) 

Slave1

Slave2

Slave3

The two ends of the corrugated 

pipe need to be protected with guard rings.

BMS

Slave1

Slave2

Slave3

Slave4

COMM1

B+

COMM2

B-

The BMS and battery modules need to be grounded. 

The BMS and battery modules need to be grounded. 

Between battery modules need to be grounded. 

The BMS and battery modules need to be grounded. 
Between battery modules need to be grounded. 

GND

+

-

To Inverter

BAT-

BAT+

CAN