1
X3-Matebox
advanced
Quick Installation Guide
1. Introduction
2. Overview
B
A
Load
Object
Name
D
C
Grid(INV)
Grid
F
E BAT
EPS(INV)/(Off-grid)
G
BAT(INV)
Description
Load connection port
Grid output portof the inverter
Battery connection port(tobatterypack)
Battery connection port of the inverter
Gridconnection port (to local grid)
EPS output portof the inverter
Meter
Meter
2) Electrical schematic diagram
1) Dimension and terminals of X3-Matebox
advanced
.
- Packing Lists
3. Preparation
4. Mounting
Step 1:
Bracket installation
Fasten the brackets to the wall, according to the following steps.
d)
Step 2: Screw the brackets on the wall
Step 3. Match the X3-Matebox
advanced
with the brackets
b)
Expansion
bolts
Rubber hammer
Torque :2
.
5
±
0
.
2N
·
m
a)
Φ
10 drill
80.0
0 mm
Screw
Inner
hexagonal
wrench
c)
Inverter bracket
Monkey Wrench
Torque: 1.5±0.2N
·
m
Monkey Wrench
Torque: 1.5±0.2 N
·
m
>
300mm
- Tools
Screwdriver
torque:1.5±0.2Nm
·
Bracket A *1
Bracket B *1
6
mm²
terminals *
2
Flange nut
s
*
3
(Expansion bolt ,
Gasket ,Self-tapping
bolt) *2
2
Matebox
Load
Grid
N-wire connector*1,
N-terminal adjacent
bridge *1
(for AU market)
Documents
X3-Matebox
N
BAT
Battery
N-BAR for loads
N-BAR for EPS(Off-grid) loads
EPS(Off-grid) loads
Loads
Inverter
PV 1
PV 2
E-BAR
Grid
Grid
EPS(Off-grid)
Main Breaker/RCD
B
re
a
k
e
r
B
re
a
k
e
r
CT
CT
-
R
CT
-
S
CT
-
T
Distribution Box
N
BAT
Battery
N-BAR for loads
N-BAR for EPS(Off-grid) loads
EPS(Off-grid) loads
Loads
Inverter
PV 1
PV 2
E-BAR
Grid
Grid
EPS(Off-grid)
Main Breaker
B
re
a
k
e
r
B
re
a
k
e
r
CT
CT-R
X3-Matebox
E-BAR
N
CT-S
CT-T
RCD
551 mm
512 mm
204.5 mm
A B
C
D
E
F
G
meter
O
ff
-
g
rid
Loads
Gr
id
Gr
id
In
ver
ter
Batt
er
y
In
ver
ter
BA
T
L3
R
L1
A
1
A
2
N
C
S
T
N
L2
N
R
L1
N
C
A
1
A
2
S
T
N
L2
L3
N
N
-
BAR
E
-
BAR
In
ver
ter
RS
485
ME
TER
M5 inner hexagon
bolts *1
Wi Dongle * 1
6
mm²
European
terminals *
2
Keys
*
4
16
mm²
Ground
terminal *1
Earth connectors (450
mm *1, 250 mm*1)
(1) Fix the inverter bracket
on the bracket B;
Use a level rstly to ensure that the brackets in the system are rmly installed and level. Then follow the
steps below to hang X3-Matebox
advanced
.
Mount X3-Matebox
advanced
on brackets and tighten the screws.
d) The Matebox should be prioritized over the
installation of the inverter. Before installing the
inverter, you need connect the ground wire and
the Dongle communication accessories)
c ) The bracket is aligned with the screw uses
the inner
hexagonal wrench to screw the
tapping screw until the expansion bolt
"bang" is heard.
b) Insert expansion bolt into the hole, use rubber
hammer to knock the expansion screw bolt into
the wall.
a) Use the bracket as a template to mark the
two holes on the
wall with a marker pen. Drill
holes at marked spots with depth of 80 mm.
Note :When installing the bracket, be sure to use a
spirit
level to test and keep the bracket parallel to
the horizontal plane.
Bracket A should be installed at a distance of 300mm (at least) from the ground.
(
2)Then set the bracket B on
the bracket A and x it with
screws;
Diagram B: N line and PE line together,
D
series
inverters;
(
Applicable to Australia)
Diagram A: N line and PE line separate wiring,
D
series inverters;
(For most countries)
There are 2 wiring diagrams for your system connection reference,
please follow your local policy to chose which one is suitable for
your side.
X3-Matebox
advanced
is a critical part for energy storage system,
which integrates the DC breaker/AC breaker/switch unit/Meter
and so on, it can easily be installed compare to the traditional
separate system, this unit can be used with Hybrid and Fit series
inverters.
Open the upper cover and the isolation plate of X3-Matebox
advanced
before wiring.
X3-Matebox
advanced *1
16
mm²
terminals
*10
16
mm²
OT terminal
*1