background image

1

X3-Matebox 

advanced

Quick Installation Guide

1. Introduction

2. Overview

B                      

A                     

Load

Object

Name

D                      

C                     

Grid(INV) 

Grid

F                      

E                     BAT

EPS(INV)/(Off-grid)

G                      

BAT(INV)

Description

Load connection port 

Grid output portof the inverter

Battery connection port(tobatterypack)

Battery connection port of the inverter

Gridconnection port (to local grid)

EPS output portof the inverter

Meter

Meter

2) Electrical schematic diagram

1) Dimension and terminals of X3-Matebox 

advanced

.

 - Packing Lists

3. Preparation

4. Mounting

Step 1:

 

Bracket installation

 

Fasten the brackets to the wall, according to the following steps. 

d)

Step 2: Screw the brackets on the wall 

Step 3. Match the X3-Matebox 

advanced

 with the brackets

b) 

Expansion 

bolts

 Rubber hammer

Torque :2

.

5

±

0

.

2N

·

m

a) 

Φ

10 drill

80.0

0 mm

Screw

Inner 
hexagonal 
wrench

c) 

Inverter bracket

Monkey Wrench
Torque: 1.5±0.2N

·

m

Monkey Wrench
Torque: 1.5±0.2 N

·

m

300mm

- Tools

Screwdriver
torque:1.5±0.2Nm

·

 Bracket A *1

 Bracket B *1

6

 

mm²

 terminals *

2

Flange nut

s

 *

3

(Expansion bolt ,
Gasket ,Self-tapping 
bolt) *2

 

2

Matebox

 Load

 Grid

N-wire connector*1,
N-terminal adjacent 
bridge *1

 

(for AU market)

Documents

X3-Matebox

N

BAT

Battery

N-BAR for loads

N-BAR for EPS(Off-grid) loads

EPS(Off-grid) loads

Loads

Inverter

PV 1

PV 2

E-BAR

Grid

Grid

EPS(Off-grid)

Main Breaker/RCD

B

re

a

k

e

r

B

re

a

k

e

r

CT

CT

-

R

CT

-

S

CT

-

T

Distribution Box

N

BAT

Battery

N-BAR for loads

N-BAR for EPS(Off-grid) loads

EPS(Off-grid) loads

Loads

Inverter

PV 1

PV 2

E-BAR

Grid

Grid

EPS(Off-grid)

Main Breaker

B

re

a

k

e

r

B

re

a

k

e

r

CT

CT-R

X3-Matebox

E-BAR

N

CT-S

CT-T

RCD

551 mm

512 mm

204.5 mm

A B

C

D

E

F

G

meter

O

-

g

rid

Loads

Gr
id

Gr
id

In

ver

ter

Batt

er

y

In

ver

ter

BA
T

L3

R

L1

A

1

A

2

N

C

S

T

N

L2

N

R

L1

N

C

A

1

A

2

S

T

N

L2

L3

N

N

-

BAR

E

-

BAR

In

ver

ter

RS
485

ME
TER

M5 inner hexagon 
bolts *1

Wi  Dongle * 1

6

 

mm²

 

European

 

terminals *

2

Keys

4

16

 

mm²

 Ground 

terminal *1

Earth connectors (450 
mm *1,  250 mm*1) 

(1) Fix the inverter bracket 
on the bracket B;

Use a level  rstly to ensure that the brackets in the system are  rmly installed and level. Then follow the 
steps below to hang X3-Matebox 

advanced

.

Mount X3-Matebox 

advanced

 on brackets and tighten the screws.

d) The Matebox should be prioritized over the 
installation of the inverter. Before installing the 
inverter, you need connect the ground wire and 
the Dongle communication accessories)

 c ) The bracket is aligned with the screw uses 
the inner 

hexagonal wrench to screw the 

tapping screw until the expansion bolt 
"bang" is heard.

b) Insert expansion bolt into the hole, use rubber 
hammer to knock the expansion screw bolt into 
the wall. 

 a) Use the bracket as a template to mark the 
two holes on the 

wall with a marker pen. Drill 

holes at marked spots with depth of 80 mm.

Note :When installing the bracket, be sure to use a 

spirit 

level to test and keep the bracket parallel to 

the horizontal plane.
Bracket A should be installed at a distance of 300mm (at least) from the ground.

(

2)Then set the bracket B on 

the bracket A and  x it with 
screws;

Diagram B: N line and PE line together, 

D

 series 

inverters; 

(

Applicable to Australia)

Diagram A: N line and PE line separate wiring, 

D

 

series inverters;

 

(For most countries)

There are 2 wiring diagrams for your system connection reference, 
please follow your local policy to chose which one is suitable for 
your side.

X3-Matebox 

advanced

 

is a critical part for energy storage system, 

which integrates the DC breaker/AC breaker/switch unit/Meter 
and so on, it can easily be installed compare to the traditional 
separate system, this unit can be used with Hybrid and Fit series 
inverters. 

Open the upper cover and the isolation plate of X3-Matebox 

advanced

 before wiring.

X3-Matebox 
advanced *1

16

 

mm²

 terminals

 *10 

16

 

mm²

 

OT terminal

*1

Reviews: