6.7.1 Self-test in accordance with CEI 0-21(applies to Italy only)
The
self
-
test
is
only
required
for
inverters
,
which
are
commissioned
in
Italy
.
The
Italian
standard
requires
that
all
inverters
feeding
into
the
utility
grid
are
equipped
with
a
self
-
test
function
in
accordance
with
CEI
0
-
21
.
During
the
self
-
test
,
the
inverter
will
consecutively
check
the
protection reaction
times
and
values
for
overvoltage
,
undervoltage
,
overfrequency
and
underfrequency
.
Selftest function is available at any time. It also allows enduser get test reports shown
on LCD display.
Operation Method
37
7.1 Control Panel
7 Operation Method
ESC
OK
A
B
C
E
F
G
H
D
I
Object
Name
A
B
C
D
E
F
G
H
I
Description
Indicator
LED
Function
Button
LCD Screen
Green: Normal working status.
Blue: Battery charging or discharging.
Yellow: Communication status.
Red: Error.
Down button: Move cursor to downside or decrease value.
ESC button: Leave from current interface or function.
OK button: Confirm the selection.
Up button: Move cursor to upside or increase value.
Display the information of the inverter.
Summary of Contents for SK-BMU1300