Quick Installation Guide

—— Triple Power Lithium-ion Battery

100 Ah

Packing List

I

Note: The Quick Installation Guide briefly describes required installation steps. If you have any question, 

please 

refer to the User

Manual 

delivered

 

with the BMS for 

details

BMS (TBMS-MCS60060): 

One

Battery Module (TP-HS50×1): 

Wall Bracket x 2

Expansion Sleeve

 x

 

4

Tapping Screw

 x

 

2

Shim Ring

 

x 2

M5*10 Phillips-head Screw x 10

All Accessories Required for Two Installation Modes

Adjustment Screw

 

x 2

Base Support 

x 2

Transverse Plate

 x 1

Expansion Bolt

 x 6

M5*8 Countersunk Head Screw

 x 4

M5*20 Countersunk Screw

 x 6

P

laten

 

(3 holes) 

x 2

P

laten

 

(2 holes) 

x 2

II

Installation Prerequisites

Ensure that the installation location meets the following conditions:

The building is designed to withstand earthquakes
The location is far 

 the sea to avoid salt water and humidity, over 3280

.

84 ft/1000 m

from

The floor is flat and level
There are no flammable or explosive materials, at a minimum of 2

.

95 ft/0.9 m

The ambience is shady and cool, away from heat and direct sunlight
The temperature and humidity remain at a constant level
There is minimal dust and dirt in area
There are no corrosive gases present, including ammonia and acid vapor 
Where charging and discharging, the ambient temperature ranges from 32

℉/

0°C to 113

℉/

45°C

   

ŸŸŸŸŸŸŸŸŸŸ
Ÿ
Ÿ
Ÿ
Ÿ
Ÿ
Ÿ
Ÿ
Ÿ

In practice, the requirements of battery installation may be different due to enviroment and locations.  
In that case, follow up the exact requirements of the local laws and standards.

The 

Triple Power

 battery module is rated at 

IP65

 and thus can be installed outdoors as well as indoors. However, if installed outdoors, the 

battery pack shall not be exposed to direct sunlight and moisture.

Note!

If the ambient temperature exceeds the operating range, the battery pack will stop running to protect itself. 

The optimal temperature range for operation is 14

/-10°C to 122

/50°C

. Frequent exposure to harsh temperatures may deteriorate its 

performance and lifetime.

Note!

For the first installation, the interval among manufacture dates of battery modules shall not exceed 3 months.

Note!

III

Overview

 (

Floor

 Mounting

)

Scheme A

Scheme B

Scheme C

BMS

Battery

Battery

Base

Distance from the equipment:

To left side: 

11.81 in./300 mm

To right side: 

11.81 in./300 mm

BMS

Battery

Battery

Base

31.81 in./808 mm

2 * Wall Bracket
2 * Expansion Bolt
2 * Tapping Screw 
2 * Gasket
14 * M5*10 Screws
2 * Platen (3 holes)
4 * Platen (2 holes)

Distance from the equipment:

To left side: 

11.81 in./300 mm

To right side: 

11.81 in./300 mm

4 * Wall Bracket
4 * Expansion Bolt
4 * Tapping Screw 
4 * Gasket
20 * M5*10 Screw
4 * Platen (3 holes)
4 * Platen (2 holes)

BMS

Battery

Battery

Base

Battery

43.62 in./1,108 mm

BMS

Battery

Battery

Base

Battery

Distance from the equipment:

To left side: 

11.81 in./300 mm

To right side: 

11.81 in./300 mm

4 * Wall Bracket
4 * Expansion Bolt
4 * Tapping Screw 
4 * Gasket
24 * M5*10 Screw 
4 * Platen (3 holes)
6 * Platen (2 holes)

BMS

Battery

Battery

Base

Battery

Battery

55.43 in./1,408 mm

BMS

Battery

Battery

Base

Battery

Battery

Steps (Floor Mounting)

IV

Step 2: Locate the Base 1.57 in./40 mm away from the 

wall, accurately mark the location of the Base on both 

sides with a pen.

Step 1: Place Base.
(1) Remove the dust cover.

(2)  Insert  M8*85  screws  from  the  bottom  of  Base,  to 

ensure that the Base is even.

(a) Use a spirit level to measure the sides of the Base to ensure they are even.
(b) If not, please adjust the Adjustment Screws by a torque wrench being to ensure that the Base 

is even.

Note!

Step 3: Place Battery Module on the Base.

(1) Remove the top and bottom dust covers.

(2) Place the Battery Module on the Base.

Please reserve enough distance from the equipment to the ceiling/ground for capacity expansion.

Take Scheme C as an example.

Right View

1.57 in

40 mm

1.57 in.

40 mm

Mark

(3)  Fix  the  Platen  (2  holes)  using  M5  *  10  Phillips-head  screw,  and 

secure M5*10 screws at both sides (Torque: 1.0 N·m).

Step 4: Place two Battery Modules in turn, and secure both left and 
right  sides  using  M5*10  countersunk  screws  (Tighten  torque:  1.0 

N·m). Refer to the Step 2 (3).
Please

 

secure Platen and M5*10 screws immediately after placing a 

Battery Module. 

Platen (2 holes) 

×

 2

M5*10 Screw 

×

 4

1.0 N·m

Step 3 (3)

Platen (2 holes) 

×

 4

M5*10 Screw 

×

 8

1.0 N·m

Step 5:

(1) Attach M5 * 10 screw to Wall Bracket but be sure not to tighten;
(2) Place Wall Bracket to the wall, align its holes to the holes on the Battery, 

and use a spirit level to ensure it's even;

(3) Accurately mark the location of the Wall Bracket on both sides;
(4) Circle along the inner ring of the holes;
(5) Remove the Wall Bracket, and then drill the two holes (at least 3.54 in./90 

mm) by a Drill (

φ

 0.39 in./10 mm).

Attach screw but not 

tighten

Mark

Electric drill dust collector is recommended.

Note!

(1)

(2)

If  the  Base  is  shifted  after  placing  a  Battery  Module,  move  it  to  its 

original location according to the mark previously drawn. 

Note!

Step 6: Place Expansion Bolts.

Step  7:  Place  the  Wall  Bracket  on  the  wall  where  the  mark  is  drawn 

previously, and secure it using Tapping Screws and Gaskets.

32 in./812.80 mm

Tapping Screw × 2

Gasket × 2

Wall Bracket × 2

Attach screw but not 

tighten

, and align the hole 

location of battery 

32 in./812.80 mm

Mark

Step 8: Place the fourth battery module.

Let the Platen 

down

Step 9: Fix the Platen (3 holes), and tighten M5*10 screws on both sides 

(Torque: 1.0 N·m).

Platen (3 holes) 

×

 2

M5*10 Screw 

×

 6

1.0 N·m

Step 11: Place BMS on the Battery Module. 

(1) Remove the bottom dust cover.

Electric drill dust collector is recommended

.

Note!

Step 10: 

(1) Attach M5 * 10 screw to Wall Bracket but be sure not to tighten;

(2)  Place  such  Wall  Bracket  to  the  wall,  align  its  holes  to  the  holes  on  the 

Battery Module, and use a spirit level

 

to ensure it's even;

(3) Accurately mark the location of the Wall Bracket on both sides with a pen;

(4) Circle along the inner ring of the holes;
(5) Remove the Wall Bracket, and drill two holes (at least 3.54 in/90 mm) by a 

Drill (

φ

 0.39 in./10 mm);

(6) Place Expansion Bolts;
(7) Secure Wall Brackets. Refer to the Steps 5, 6, 7 and 8.

32 in./812.80 mm

Step 5

,

 6, 7 and 8

Let the Platen 

down

Step 9

Platen (3 holes) 

×

 2

M5*10 Screw 

×

 6

1.0 N·m

Tapping Screw × 2

Gasket × 2

Wall Bracket × 2

32 in/81

2.80 mm

Mark

(2)  Place  BMS,  fix  the  Platen  (3  holes)  on 
both  sides,  and  then  tighten  M5*10  screws 
(Torque: 1.0 N·m). Refer to Step 9.

Documentation x 1

BMS

Battery

Battery

Base

BMS

Battery

Battery

Base

Battery

BMS

Battery

Battery

Base

Battery

Battery

The holes on BMS is for secure inverter. For details, please refer to A1-

ESS-G2 User Manual.

Note!

32 in/812.80 mm

BMS x 1

User Manual x 1

Battery Module x 1

Expansion Bolt x 4

Wall Bracket x 2

Gasket x 2

Platen (2 holes) x 2

Tapping Screw x 2 M5*10 Phillips-head Screw x 10

Platen (3 holes) x 2

Quick Installation Guide x 1

Base Support x 2

Expansion Screw x 6

Transverse Plate x 1

M5*8 Countersunk Head Screw x 4

M5*20 Countersunk Screw x 6

Adjustment Screw x 2

Self-tapping Screw x 6

Base for BAT50-G2 Battery: 

Base x 1

Φ

 0.39 in./10 mm

for Wall Bracket

 3.54 in./ 

90 mm

Safety

 

Instructions x 1